BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2025 at 7:00 PM

Updated December 16, 2025

Site work and new construction of a playground / park / athletic field in Wellesley, Massachusetts. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Honeywell Field Team Room Building. Construction of a fabricated engineered modular team room building which includes: locket rooms, bathrooms and utility space. Scope includes but not limited to modular building, concrete foundation, precast stairs, precast ramp and site development work. Contractor Qualification DCAMM Certificate Question Deadline 10/09/2025 Every request for such interpretation should be in writing (typed, not handwritten) addressed to Weston & Sampson Engineers, Inc., 55 Walkers Brook Drive, Reading, Massachusetts 01867 Attention: Sarah Foley, or sent via email to foleys@wseinc.com The scope of work includes construction of The scope of work includes the construction of a new fabricated engineered modular team room building located at the Hunnewell field complex. The project includes, but is not limited to, construction of a modular building which includes locker rooms, bathrooms, and associated utility spaces. The project also includes concrete building foundation and precast exterior access stairs and ADA ramp. The site development work will include, but is not limited to, earthwork, grading, drainage, paved walkway and associated riverfront mitigation planting.

Post-Bid

Playgrounds / Parks / Athletic Fields

$1,100,000.00

Public - City

New Construction, Site Work

24

18

10

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
592
Active Projects
225
Bidding Soon
4,457
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

December 22, 2025

Project location map

55 Rice St, Wellesley, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.