Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 13, 2025 at 8:00 PM

Updated October 17, 2025

New construction of a mixed-use development in East Ellijay, Georgia. Completed plans call for the construction of a 18,775-square-foot, one-story above grade educational facility.

Gilmer High School Auxiliary Gymnasium The Building is a One-story Pre-engineered Metal Building Which Hosts: Locker Rooms, Coaches Offices, Restrooms and Gymnasium Area Which Includes Courts and Batting Lanes. Bid Bond - Special attention is called to bid packages requiring Bid Bonds. All Bid Bonds will be in the amount of 5% of bid and the bonding company shall be a surety company certified on the United States Department of the Treasury's Listing of Approved Sureties (Department Circular 570), and rated no less than "A" by A.M. Best ratings agency and acceptable to the Construction Manager. The form of bond shall be AIA Document A310, Current Edition. Payment & Performance Bond - Special attention is called to bid packages requiring payment and performance bonds. All bonds are 100% Performance and Payment Bonds and the bonding company shall be a surety company certified on the United States Department of the Treasury's Listing of Approved Sureties (Department Circular 570), and rated no less than "A" by A.M. Best ratings agency and acceptable to the Construction Manager. Bonds to be submitted with Seven (7) Days of award of contract.

Post-Bid

Educational

$5,200,000.00

Public - County

New Construction

51

34

9

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
340
Active Projects
153
Bidding Soon
2,211
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

November 5, 2025

Project location map

408 Bobcat Trail, East Ellijay, GA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed