Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Site work for a civil project in Oklahoma City, Oklahoma. Completed plans call for site work for a water / sewer project.

Reference Number 0000398091 Prequalification Requirement is Water Facilities Contractor "A". - Second Atoka Pipeline Interim Surge Stations To bid on this Contract, the Bidder must be prequalified by the City of Oklahoma City's Prequalification Review Board on the Bid Date and Bid Time as: Water Facilities contractor "A". In addition, any work for which a prequalification classification has been established, must be performed by persons or entities prequalified in those classifications. Buyer Requires E-Bonding - Bid Bond 5 % Bid Security in the form of a cashier's check, a certified check, or a surety bond in the amount of five percent (5%) of the bid as defined in the Bidding Documents must accompany the bid. The Maintenance Bond shall be in favor of the Awarding Public Agency and shall be for a period of Two (2) years in an amount equal to one hundred percent (100%) of the Contract amount. Question Deadline 10/15/2025 at 4:00 PM CT Questions are submitted online Yes Bidder must complete this Project in accordance with the Bidding Documents, Addenda, and Oklahoma City Standard Specifications for Construction of Public Improvements within nine hundred seventy three (973) calendar days of date as stated in the Work Order. Project Location: The pump stations are located at the following addresses: Second Macomb Pump Station 24590 Fish Market Road Tecumseh, Oklahoma 74873 Second Ada Pump Station 14731 County Road #3605 Ada, Oklahoma 74820 Second Coalgate Pump Station 3524 W. Highway 31 Coalgate, Oklahoma 74538 The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Construction of the Interim Surge Stations at the Second Macomb Pump Station, Second Ada Pump Station, and Second Coalgate Pump Station including all related civil/ sitework, structural, architectural, HVAC/plumbing, electrical, instrumentation/controls, and all other miscellaneous and appurtenant items as shown on the drawings and specified herein. 2. Performance test all new equipment, systems instrumentation/controls and other items as specified herein. 3. Perform all relocations and modifications of any existing yard piping and underground utilities as required to accommodate the new work as shown on the drawings and specified herein. 4. Provide site security at each pump station site for the duration of the project. Security is the sole responsibility of the Contractor.

Bid Results

Water / Sewer

$40,848,000.00

Public - City

Site Work

188

27

33

10

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
41
Bidding Soon
759
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2025

November 28, 2025

Project location map

Multiple Locations, Oklahoma City, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.