BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 23, 2025 at 8:00 PM

Updated October 24, 2025

Site work and paving for a mixed-use development in North Kingstown, Rhode Island. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; road / highway; and road / highway.

0055H - Post Road & West Main Street Curb & Sidewalk Federal Aid Project No. NHP-5120001 & NHP-5120002 This project consists of curb and sidewalk improvements on Post Road from Camp Avenue to West Main Street and on West Main Street from Post Road to Brown Street (total of 2.14 miles) in North Kingston, Rhode Island. The proposed work on this project will include, but is not limited to installation of new precast concrete curb and new cement concrete sidewalks along Post Road, installation of new granite curb and reconstruction of the existing exposed aggregate sidewalk along West Main Street within the Wickford Historic District, installation of ADA compliant curb ramps, traffic and pedestrian signal improvements, micromilling and resurfacing pavement, curb line adjustments, new pavement markings, drainage system improvements, construction of stormwater treatment units (STUs), placement of plantable soil and seed, and new tree installations on West Main Street. Vendor Q&A Start Date: September 25, 2025 at 11:15:00 AM EDT Vendor Q&A End Date: October 12, 2025 at 12:00:00 PM EDT If you have any questions, please contact: M. Scott Stephens 1 Capitol Hill 2nd Floor Providence RI, 02908 United States Tel: 401-574-8152 Fax: michael.stephens@purchasing.ri.gov The Contractor will be required to meet the established goal of not less than DBE 8% percent of the contract bid price to the Contractors, Subcontractors, and/or suppliers which qualify as Disadvantaged Business Enterprises A bid bond payable to the State of Rhode Island, in the amount of 5% of the total or gross sum of the bid must be furnished by each bidder. A performance bond of one hundred (100) percent of the contract price with a satisfactory surety company will be required of the successful bidder. All surety companies must be listed with The Department of the Treasury, Fiscal Services, Circular 570, (Latest Revision published by the Federal Register), The Department of Transportation reserves the right to reject any or all bids. RIDOT: Post Road & West Main Street Curb & Sidewalk

Bid Results

Sidewalks / Parking Lot

$14,119,369.00

Public - State/Provincial

Paving, Site Work

255

23

17

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
588
Active Projects
267
Bidding Soon
3,785
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2025

November 20, 2025

Project location map

Multiple Locations, North Kingstown, RI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.