BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 7, 2025 at 8:00 PM

Updated October 8, 2025

Renovation of a residential development in Point Marion, Pennsylvania. Working plans call for the renovation of a residential development.

The County of Greene, an "Equal Opportunity Employer", will receive proposals for General Contractors to complete a home rehabilitation project in Dilliner, PA. Repairs will include, but are not limited to: roof membrane replacement, ceiling repairs, plumbing, electrical, HVAC, Deck replacement, flooring repairs, and other interior and exterior repairs. This service will be funded in part by federal grant funds through the HOME Investment Partnership Program administered by the County of Greene and the Pennsylvania Department of Community and Economic Development. The home rehab program is seeking General Contractors with a current Home Improvement Contractor (HIC) License & insurance to rehabilitate this home to correct code deficiencies. Required general contractor services for this projects may include, but are not limited to: following the scope of work prepared by the housing inspector for work; following detailed work descriptions which cause the subject structure to meet acceptable HUD Quality Standards and local building codes; progress inspections (to include photo documentation at required intervals) and, with consultation with the County Housing Inspector, securing and documenting of related costs for the needed work write- up repairs. The general contractor shall procure and maintain (at its expense) subcontractors to complete any area of work which the general contractor is not qualified to complete (i.e., HVAC or other areas requiring licensure for which the general contractor is not licensed to complete nor employs any worker possessing such qualifications). Contracts will be signed between the Contractor and the Homeowner(s), with the County managing the project and providing payment to the contractors at specified intervals (upon satisfactory progress inspections). Prepared by W. Dickerson on 8/6/25 Item #1 Roof Membrane A. Install a EPDM roof membrane (45 mil), color shall be white, over the dwelling. B. Ensure a secure seal around all membrane penetrations. C. Install a 2" aluminum collar around the perimeter of the membrane. D. Roof membrane shall be 15' in width. Bid to complete: $___________________ Item #2 Living Roof Ceiling (Over TV) A. Remove and replace the existing ceiling tiles and related grid (above the tv area). B. Tiles shall be white in color, and of mineral composition. Bid to complete: $___________________ Item #3 Washer Standpipe A. Remove and replace the existing water supply valve on the washer standpipe. Bid to complete: $___________________ Item #4 Soft Flooring AreasItem #5 Guest Bathroom A. Remove and replace the existing ceiling in the guest bathroom. B. Remove and replace the existing shower stall. Bid to complete: $___________________ Item #6 Master Bathroom Shower A. Remove and replace the existing bathtub and surround. B. Install a three piece walk-in shower (Alcove design). C. To include new water supply and drain fixtures. Bid to complete: $___________________ Item #7 Septic Pump Electric Supply A. Install electric supply from the main breaker panel, to the supplied feed wiring provided to the vicinity of the breaker panel. Call for an inspection when this item is completedtem #8 Electric Dryer A. Remove and replace the existing clothes dryer. B. Dryer shall be a 7.0 cu. ft, front load design. Bid to complete: $___________________ Item #9 Closet RingItem #10 Skylight Removal A. Remove the existing skylights in the kitchen and master bath ceilings. B. Install a new suspended ceiling at both locations. C. Grids and ceiling tiles shall be white, and the tiles shall be of mineral composition. Bid to complete: $___________________ Item #11 Furnace replacement A. Remove the existing electric furnace, and replace with a unit at rated at 67,000 btu Bid to complete: $___________________ Item #12 Deck Board Replacement A. Remove the existing deck boards on the side "A" deck. B. Replace with pressure treated 1-1/4" X 6" above ground deck boards. A. Remove and replace the water closet ring on the guest bathroom commode

Final Planning

Residential Subdivision

$32,600.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
82
Bidding Soon
1,294
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2025

November 5, 2025

Project location map

Multiple Locations, Point Marion, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.