Site work and new construction of a fire / police facility in Muscatine, Iowa. Conceptual plans call for the construction of a fire / police facility; and for site work for a fire / police facility.
Although not located directly on the Mississippi River, the former Police Pistol Range was severely damaged by extended flooding in 2019. Since flooding of this building had occurred several times in prior years, it was determined that a new building to be located on higher ground or at a different site was needed. The former range building was demolished in 2020/2021. The City contracted for consultant services to assist in identifying suitable sites for the new range. After the initial site was not approved for the necessary rezoning, a decision was made to locate the new facility on City-owned property at the Muscatine Airport. At the time the budget was being prepared, construction was scheduled to begin in 2024/2025 and be completed in 2025/2026. The City, however, is still working with the Federal Aviation Administration (FAA) to receive approval and comply with their requirements before construction can begin. The Muscatine County Sheriffs department has agreed to pay 50% of the cost of locating a suitable site and constructing a new range facility. The City’s share, estimated at $700,000, was included in the spring 2024 bond issue. The project is included in the City's 2025-2026 Capital Improvement Program (CIP). As of December 4, 2025, information regarding design firm, construction manager, and general contractor has not been released. Further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Fire / Police
$1,050,800.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 3, 2026
To Be Determined, Muscatine, IA
Related To This Project
Muscatine, IA
Bid Date: Dec 10 2025
Muscatine, IA
Bid Date: Dec 15 2025
Muscatine, IA
Bid Date: Dec 08 2025
Muscatine, IA
--
Muscatine, IA
--
Muscatine, IA
--
Muscatine, IA
--
Muscatine, IA
--
Muscatine, IA
Bid Date: Nov 20 2025
Muscatine, IA
Bid Date: Oct 22 2025
Muscatine, IA
Bid Date: Oct 27 2025
Muscatine, IA
Bid Date: Jul 21 2020
Muscatine, IA
Bid Date: Oct 28 2025
Muscatine, IA
Bid Date: Sep 29 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.