Site work for a playground / park / athletic field in Lake Forest, California. Completed plans call for site work for a playground / park / athletic field.
The El Toro Pickleball Court project will replace the existing sand volleyball court with three contiguous concrete pickleball courts and associated improvements. Work includes securing the site, installing erosion control measures, and removing existing sand, turf, irrigation components, and debris while protecting specified trees. Earthwork will involve grading and compacting the subgrade, followed by placement of a three-inch Class II aggregate base. The court will be constructed with a six-and-a-half-inch Portland Cement Concrete slab, finished with an acrylic Plexipave surface. A four-inch Portland Cement Concrete pedestrian pavement will also be installed. Fencing will include four-foot perimeter chain link, ten-foot court fencing with privacy screening, and a five-foot-wide by ten-foot-high gate, all with new concrete footings. Pickleball posts and net will be installed per manufacturer specifications. Question Deadline 10/15/2025 at 5:00 PM PT Discrepancies in, and/or omissions from the Plans, Specifications or other Contract Documents or questions as to their meaning shall be immediately brought to the attention of City by submission of a written request for an interpretation or correction to City. Such submission, if any, must be sent via electronically. The time of completion of this project is forty five (45) working days from the commencement date indicated on the Notice to Proceed. Anticipated Project Start Date:January 1, 2026 Bids must be accompanied by cash, a certified or cashier's check, or a Bid Bond in favor of the City in an amount not less than ten percent (10%) of the submitted Total Bid Price. The successful bidder will be required to furnish City with a Performance Bond equal to 100% of the successful bid, and a Payment Bond equal to 100% of the successful bid, prior to execution of the Contract. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and is admitted by the State of California.
Bid Results
Playgrounds / Parks / Athletic Fields
$359,998.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2025
January 1, 2026
23701 Los Alisos Blvd, Lake Forest, CA
Related To This Project
Lake Forest, CA
Bid Date: Oct 14 2025
Lake Forest, CA
Bid Date: Dec 22 2025
Lake Forest, CA
Bid Date: Oct 22 2025
Lake Forest, CA
Bid Date: Nov 12 2025
Lake Forest, CA
Bid Date: Dec 05 2025
Lake Forest, CA
Bid Date: Nov 13 2025
Lake Forest, CA
Bid Date: Feb 25 2021
Lake Forest, CA
Bid Date: Aug 22 2025
Lake Forest, CA
Bid Date: Jul 16 2025
Lake Forest, CA
--
Lake Forest, CA
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.