BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 23, 2025 at 8:00 PM

Updated October 24, 2025

Site work and paving for a bridge / tunnel in Ravenna, Ohio. Completed plans call for site work for a one-story above grade bridge / tunnel.

DESCRIPTION OF WORK Work will include the improvement of 0.06 miles of Newton Falls Road by the replacement of an existing Steel Pony Truss structure with a new single-span superstructure and substructure including minimal approach work. Furnish all labor, materials, and equipment necessary to complete the project known as the Newton Falls Road Bridge Replacement Project PID 119501, in Paris Township, Portage County. Specifications and Bidding Forms can be obtained from the designated web service or from the Portage County Engineer's Office. Each bidder is required to furnish with its proposal a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. The project must be completed no later than September 26, 2026. Bid security furnished in bond form shall be issued by a surety company or corporation licensed in the State of Ohio to provide said surety. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. The basis of award shall be the lowest and best bid. DBE participation goals have been set for those certified as DBEs in accordance with TEA-21 (1998) and 49 CFR, Part 26, and qualified to bid with ODOT under Chapter 5525 of the Ohio Revised Code. Pre-qualification requirements: Only ODOT Prequalified contractors are eligible to submit bids for this project. Pre-qualification status must be in force at the time of bid, at the time of award, and through the life of the construction contract. Each bidder must submit evidence of its experiences on projects of similar size and complexity. Contractors must comply with the equal employment opportunity requirements of the Ohio Administrative Code Chapter 123, Governor's Executive Order of 1972, and Governor's Executive Order 84-9. Bidders must comply with Federal (Davis Bacon) wage rates. All steel products must meet the requirements of ODOT C&MS 106.09. Completion- September 26, 2026 Engineers estimate of cost for this improvement is $1,283,336.62 DBE Goal: 8% Replacement of sen 6732570 newton falls rd bridge over the west branch of the mahoning river in paris township, portage county, ohio. this project also includes full depth asphalt replacement for two, eleven foot lanes with approach widening to accommodate the new bridge configuration. 6732570

Bid Results

Bridges / Tunnels

$1,179,000.00

Public - County

Paving, Site Work

47

9

2

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
377
Active Projects
206
Bidding Soon
2,022
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

December 22, 2025

Project location map

Newton Falls Rd, Ravenna, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.