Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 21, 2026 at 7:00 PM
Updated January 23, 2026
Demolition, site work, renovation and addition to a water / sewer project in West Palm Beach, Florida. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
1) Letter of Interest (20 printed pages maximum) including reference to this Notice. Minimum font of 11 and minimum margins of 0.75" requested along with sufficient spacing within the letter. 2) GSA Form SF 330, to include those personnel within your firm, or sub-consultants who have expertise in the following categories: 5.02 Topography Engineering Surveying 6.01 Soils, Foundation and Material Testing Geological and Geophysical Studies 6.04 Soils and Foundation Hydraulics & Hydrologic Studies 7.01-7.05 Architectural Architect 7.06 Architectural Landscape Architecture 8.03 Mechanical Engineering Water Supply Treatment Systems 8.04 Mechanical Engineering Water Distribution Systems 9.03 Electrical Engineering Industrial Facilities 10.03 Structural Engineering Industrial 12.06 Environmental Engineering Water Resource Evaluation and Development 12.07 Environmental Engineering Water and Wastewater Treatment Process Design Subsurface Utility Engineering 3) Prime Consultant Questionnaire 4) Sub-Consultant Qualification Questionnaire (for each sub-consultant) 5) EBO Schedules 1 and 2 6) Commercial Non-Discrimination Certification 7) Conflict of Interest Disclosure Form 8) Design-Build Entity Minimum Qualifications to demonstrate the following: Design-Build Experience Safety Record Bonding Capacity Licensure Design Staff Experience Construction Staff Experience Integrated Design-Build Team Experience 9) Design-Build Entity Reference Form (as needed) The Proposer is encouraged to review the Desiqn-Build Aqreement example. It is intended to provide a contractual mechanism for Palm Beach County to obtain Design-Build professional engineering and construction services within the scope of the practice of architecture, engineering, land surveying, preconstruction, construction management and construction as defined by the laws of the State of Florida including evaluation, piloting, design, permitting, staff assistance, DesignBuild and services during construction for the Water Treatment Plant No. 8 Membrane Expansion Progressive Design-Build (Project). It is anticipated that a single Agreement will be issued for Phase I (Pre-construction Services) and amended for Phase 2 (Construction Services) Project per the requirements of the Consultants' Competitive Negotiation Act (CCNA) Florida Statutes 287.055 The project budget for all services is estimated to be $200,000,000 to $250,000,000. Palm Beach County reserves the right to reject any or all responses; to waive any or all informalities and/or irregularities; to re-advertise with either an identical or revised scope, or to cancel the solicitation in its entirety.
Post-Bid
Water / Sewer
$250,000,000.00
Public - County
Addition, Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 3, 2025
May 4, 2026
To Be Determined, West Palm Beach, FL
Related To This Project
West Palm Beach, FL
Bid Date: Oct 28 2025
West Palm Beach, FL
Bid Date: Oct 22 2025
West Palm Beach, FL
Bid Date: Oct 22 2025
West Palm Beach, FL
Bid Date: Dec 31 2025
West Palm Beach, FL
Bid Date: Nov 17 2025
West Palm Beach, FL
Bid Date: Nov 03 2025
West Palm Beach, FL
Bid Date: Oct 08 2025
West Palm Beach, FL
Bid Date: Oct 30 2025
West Palm Beach, FL
Bid Date: Oct 14 2025
West Palm Beach, FL
Bid Date: Oct 16 2025
West Palm Beach, FL
Bid Date: Nov 18 2025
West Palm Beach, FL
Bid Date: Nov 13 2025
West Palm Beach, FL
Bid Date: Oct 16 2025
West Palm Beach, FL
Bid Date: Oct 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
