BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2025 at 8:00 PM

Updated November 18, 2025

Renovation of an educational facility in West Palm Beach, Florida. Completed plans call for the renovation of a one-story above grade educational facility.

This project involves the complete removal and replacement of the roofing system at Buildings 1 and 2 at Grassy Waters Elementary School, including all specified repairs and installations. The work includes removal of existing roofing materials and insulation, demolition of the underlayment system, temporary removal and re-installation of mechanical equipment and electrical connections as needed, clean-up and legal disposal of all debris, creation or enlargement of thru parapet openings for new and existing overflow scuppers, inspection and repair or replacement of underlying roof structure as required, installation of new underlayment and waterproofing materials, installation of new flashing, scuppers, and accessories, removal and re-installation of the lightning protection system in accordance with required standards, and final inspection to ensure all work meets codes, specifications, and project requirements. Additional requirements include the potential for removal or modification of fencing for access, restoration of damaged areas, coordination with school activities for work scheduling, compliance with all relevant codes and specifications, and proper clean-up and disposal of project debris. All products and services within the scope may be added during the contract, with deletions and discontinuations to be reported by the vendor. Security signage is not included in the bid and should not be priced. ESTABLISHED PROJECT BUDGET FOR CONSTRUCTION: $1,612,000.00 Question Deadline 11/03/2025 at 2:00 PM ET Only questions received via Online by the time and date specified will be answered by Addendum and posted online. Jim Smith is authorized only to direct the attention of prospective Bidders to various portions of the ITB so that they may read and interpret such for themselves. Pre-qualification requirements: Certified Roofing Contractors must be prequalified by the School Board pursuant to SREF Chapter 4.1 prior to the Bid Due Date. Vendors must demonstrate bonding capacity in the amount of the advertised Construction Budget or provide evidence of such bonding capacity prior to the Bid Due Date. Each bid must include a Bid Guarantee of $80,600 in the form of a Bid Bond or Cashier's Check. All Bidders must be licensed pursuant to Chapter 489 Florida Statutes. Attendance and sign-in at a mandatory site inspection is required to be eligible to submit a bid. The successful bidder must furnish a 100% Performance Bond. Bids must be submitted electronically as a single file. Only vendors attending the mandatory onsite visit may submit a bid.

Post-Bid

Educational

$1,612,000.00

Public - County

Renovation

33

27

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
131
Bidding Soon
1,861
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2025

January 16, 2026

Project location map

3550 N Jog Rd, West Palm Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.