BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Site work for a playground / park / athletic field in Lakeland, Florida. Working plans call for site work for a playground / park / athletic field.

DEADLINE FOR QUESTIONS: October 28, 2025 SCOPE OF WORK The City of Lakeland (OWNER) is seeking competitive bids for construction services for hydrologic enhancements to a Flood Compensation Area and shoreline enhancement of the Lake Parker Existing Shoreline. The project area is located on the north-northeast shoreline of Lake Parker. The proposed construction activities include regrading the flood compensation area and shoreline within the project area for water quality enhancement and erosion control purposes, installation of a culvert into the flood compensation area for water level maintenance, and planting for ecological purposes. The plans delineate the specific improvement locations and project requirements. The work will be constructed utilizing land-based equipment. If necessary, small boats may be used to support deploying and retrieving the turbidity curtain, and turbidity sampling if required. Question Deadline 10/20/2025 at 5:00 PM ET All Questions regarding this request for proposals shall be in writing and submitted electronically via Online. Summary The proposed construction activities shall include regrading the flood compensation area and shoreline within the project area for water quality enhancement and water quality control purposes, installation of a culvert into the flood compensation area for water level maintenance, and planting for ecological purposes. The Procurement and Contracting Documents, Requirements, Specifications, and Technical Provisions, Required Forms, and Fillable Bid Forms are located in the "Attachments" section of this Bid Package. Background The northern shoreline of Lake Parker, located in the City of Lakeland within Polk County, at Latitude/Longitude (28.0855, -81.9425), has the potential for habitat restoration, including the promotion of beneficial submerged aquatic vegetation, emergent aquatic vegetation, and forested vegetation plantings and management. Historically, the Project shoreline was altered due to mining activities, which are estimated to have occurred between 1958 and 1968. The effects of mining activities have resulted in steep topographic shoreline grades in various areas, with a minimal extent of littoral and aquatic vegetation. The Project was also created to facilitate the establishment of beneficial vegetation to improve water quality in the project area by re-establishing topographic contours along the northern shoreline of Lake Parker. RFP questions deadline:October 20, 2025, 5:00pm All Questions regarding this request for proposals shall be in writing and submitted electronically via the Portal through the Question and Answer tab before 5:00 pm on Tuesday, October 28, 2025. Responses will be released on the Question and Answer Tab. Contact Information Tara Walls Senior Buyer 1140 East Parker Street Lakeland, FL 33801 Email: tara.walls@lakelandgov.net Phone: (863) 834-6780

Final Planning

Playgrounds / Parks / Athletic Fields

$469,000.00

Public - City

Site Work

25

19

17

7

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
358
Active Projects
159
Bidding Soon
2,710
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2025

December 16, 2025

Project location map

Multiple Locations, Lakeland, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.