Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 2, 2026 at 8:00 PM
Updated April 3, 2026
Site work for a bridge / tunnel in Sedro Woolley, Washington. Conceptual plans call for site work for a bridge / tunnel.
The existing paint on the steel surfaces is weathered and damaged, allowing corrosion to occur. Cleaning and painting the steel surfaces will preserve the bridge and maintain the safety of the highway. Length : 0.020 Begin Termini : SR 20 MP 76.93 End Termini : SR 20 MP 76.95 The project is included in the State/Provincial 2026-2029 Capital Improvement Program (CIP). As of April 2,2026, further details have not yet been identified. WADOT - SR 20/Scott Paper Rd Overcrossing Bridge - Painting *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$591,100.00
Public - State/Provincial
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2029
State Rte 20 & Scott Paper Rd, Sedro Woolley, WA
Related To This Project
Sedro Woolley, WA
--
Sedro Woolley, WA
--
Sedro Woolley, WA
Bid Date: Dec 10 2025
Sedro Woolley, WA
Bid Date: Oct 16 2025
Sedro Woolley, WA
Bid Date: Jan 29 2026
Sedro Woolley, WA
Bid Date: Feb 05 2026
Sedro Woolley, WA
Bid Date: Feb 10 2026
Sedro Woolley, WA
Bid Date: Feb 17 2026
Sedro Woolley, WA
Bid Date: Oct 16 2025
Sedro Woolley, WA
Bid Date: Aug 26 2025
Sedro Woolley, WA
Bid Date: Aug 06 2025
Sedro Woolley, WA
Bid Date: Jul 02 2025
Sedro Woolley, WA
--
Sedro Woolley, WA
Bid Date: May 15 2025
Sedro Woolley, WA
Bid Date: May 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
