BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 31, 2025

Site work for a bridge / tunnel in Sedro Woolley, Washington. Conceptual plans call for site work for a bridge / tunnel.

Skagit County Public Works Department invites the submittal of written statements of qualifications from Consultants interested in providing Professional Engineering, Environmental Permitting, Right of Way Services, and other related work for the design of the Little Coal Creek Culvert Replacement (Minkler Rd), County Project No. EO212-323. During the November2021, the existing culvert on Minkler Road at Little Coal creek that was con- structed in the 1960s, was severely damaged. Funding has been authorized to begin the design of a re- placement culvert meeting current environmental and hydraulic standards. The work to be performed by the selected Consultant may include but is not limited to; preparation of the PS&E including design of the project, preparation of project plans and specifications in compliance with local, state, and federal requirements, an estimate of construction costs, right of way acquisition and certification, environmental permitting, surveying, geotechnical design, and cultural resource investigation. Skagit County reserves the right to retain the services of the successful firm for any subsequent phases, including Right of Way, and Construction, for pre-bid support and construction services such as: submittal reviews, RFIs, change orders, on-site inspections, contract close out, and other construction-related tasks. Consultants are alerted that this is a FEMA funded project. This project currently has a mandatory Disadvantaged Business Enterprise (DBE) goal of zero percent (0%); how- ever, Skagit County encourages all perspective Consultants to utilize DBE firms. Cover letter shall include the following information: Firm name, phone number, and email address; Name of Principal-in-Charge, Project Manager, and Key Personnel. The Submittal package shall not exceed a total of seven (7) pages (single-sided, letter size) stating qualifications. Skagit County is not requesting any cost proposal or element of cost to be submitted with the Statement of Qualifications (SOQ) at this time. Cost information shall not be submitted with your SOQ. Please email Brenda Olson at brendao@co.skagit.wa.us to be added to the Consultant Contact List for this project. Any questions or additional information related to this project will be distributed to all parties on this list. CONSULTANT EVALUATION CRITERIA (100 Points Total) Submittals will be evaluated and ranked based on the following criteria: 1. In-house expertise and key personnel assigned to this project for its duration.(20 pts) 2. Experience with WSDOT PS&E, Federal Highway Administration Standards and Requirements, and Skagit County Standards, Specifications, and Requirements as well as the FEMA Public Assistance Program. (20 pts) 3. Experience as a Design Consultant on culvert replacement projects - valued between $0.5 to $3.0million. (15 pts) 4. Approach to the project.(20 pts) 5. Ability to meet schedule. (15 pts) 6. Past performance/references. (10 pts) 7. Statements of Qualifications must not exceed seven (7) pages (single-sided, letter size) stating qualifications. Any submittal which exceeds this limit will be deducted five (5)points per additional page.(-5 pts per page) The top three (3) scoring firms from the SOQ review period will be contacted for an interview. The highest-ranking firm from the interview round will be invited into contract negotiations with the County. Skagit County will use WSDOT's Local Agency A&E Professional Services Negotiated Hourly Rate Consultant Agreement for the contract with the selected Consultant. The Consultant and any subconsultants are required to provide a current, approved Indirect Cost Rate letter or Safe Harbor Rate letter from WSDOT to be incorporated into the agreement. Invoices from the Consultant shall be paid by check issued by Skagit County Question Deadline 10/30/2025 at 4:00 PM PT Any questions regarding this project shall be directed inwriting to Rachael Simms atrsimms@co.skagit.wa.us Answers Posted November 4, 2025, by 4:00 p.m. Review and rank SOQs November 17 - 21, 2025 Consultant selection interviews December 8-11,2025 Consultant selection / Begin negotiation December 9, 2025 FEMA approval / Execute contract January 2026 Begin work with Consultant February 2026 Begin construction Spring 2028 Complete work / End contract February 2029 All SOQ's will be reviewed within two weeks of the submittal deadline. The top three firms will be contacted to schedule interviews once all SOQ's are assessed. Negotiations will proceed with the most qualified firm once all interviews have been completed and scored. Skagit County anticipates having an executed contract with the selected Consultant by January 2026 AMERICANS WITH DISABILITIES ACT (ADA) INFORMATION Skagit County in accordance with Section 504of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. This material can be made available in an alternate format by emailing Rachael Simms at rsimms@co.skagit.wa.us or calling (360) 416-1400. The Skagit County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. For questions regarding Skagit County's Title VI Program, you may contact the Public Works Department's Title VI Coordinator, Michael See, at (360)416-1400. Skagit County reserves the right to amend terms of this "Request for Qualifications" (RFQ) to circulate various addenda, or to withdraw the RFQ at anytime. The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

$200,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
289
Active Projects
98
Bidding Soon
3,147
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2026

Project location map

Minkler Rd, Sedro Woolley, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.