BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2025 at 8:00 PM

Updated October 1, 2025

Site work and paving for a road / highway in Seattle, Washington. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Construction of a shared-use path along Pacific Hwy S from S 308th St to S 288th St. The non-motorized improvements include a path/trail that for portions of the alignment will parallel the roadway and portions will be located within the (partially unopened) right-of-way for 16th Ave S. The segments of the trail located off-roadway will include pedestrian-scale illumination for safety. The project will include traffic calming, pedestrian crossing improvements, and bulb-outs. Phase 1 will include a compact roundabout at 304th trail crossing. Phase 1 also includes signal modifications for pedestrian movements including scramble phase. The project will be constructed in two phases. Phase 1 of construction is programmed and will be on 16th Ave S from S 304th to Dash Point Road. Phase 2 is programmed and will include S 308th St to S 304th St and Dash Point Rd to S 288th St. This is a multi-year project, and the programming reflects the funds available within the span of the regional TIP. County: King Length : 1.200 Agency: Federal Way Begin Termini : S 308th St End Termini : S 288th St As of September 30 , 2025, the project is in Final Planning status. Anticipated letting Year is 2025. WADOT - Pacific Highway Non-Motorized Corridor - 16th Ave S (S 308th St to S 288th St) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$8,548,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
0
Bidding Soon
1,056
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

Project location map

16th Ave S, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.