BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Site work, paving and outdoor lighting for a mixed-use development in Lees Summit, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Project includes the following Work: The Work for the project, NW Ward Road Improvements (Blue Parkway to O'Brien Road), includes, but is not necessarily limited to: Approximately 2150 linear feet of two-lane concrete residential roadway reconstruction of NW Ward Road and associated intersections with curb & gutter, sidewalks, driveway approaches, and roundabout at the intersection of NW Ward Road and Blue Parkway. Enclosed storm sewer system, sanitary sewer replacement, water main replacement, and street lighting as shown on the plans and indicated in the specifications. The proposed work includes: Reconstructing approximately 2,000 feet of Ward Road as a 2-lane roadway from NW Blue Parkway to NW O Brien Road with either bike lanes or an unmarked wide curb lane to accommodate bicycles. The project includes, but is not limited to, paving, sidewalks, curb and enclosed storm drains, street lighting, installation of water line, sanitary sewer and other livable street components. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 from the current version of the Missouri Standard Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening A certified or cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The City of Lees Summit, Missouri reserves the right to reject any or all bids. The DBE Goal for this project is 6% and 1 On-the-job trainee. No 2nd tier subcontracting will be allowed on this project. MODOT - NW Ward Road Improvements Questions must be received by 5:00 p.m. on Thursday, October 16, 2025. Questions are to be addressed to Scott Eason at scott.eason@cityofls.net.

Bid Results

Roads / Highways

$4,913,531.00

Public - City

Outdoor Lighting, Paving, Site Work

210

43

8

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
72
Bidding Soon
1,193
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

December 22, 2025

Project location map

NW Ward Rd, Lees Summit, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.