Published November 6, 2025 at 7:00 PM
Updated November 7, 2025
Site work, paving and outdoor lighting for a mixed-use development in Lees Summit, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The Project includes the following Work: The Work for the project, NW Ward Road Improvements (Blue Parkway to O'Brien Road), includes, but is not necessarily limited to: Approximately 2150 linear feet of two-lane concrete residential roadway reconstruction of NW Ward Road and associated intersections with curb & gutter, sidewalks, driveway approaches, and roundabout at the intersection of NW Ward Road and Blue Parkway. Enclosed storm sewer system, sanitary sewer replacement, water main replacement, and street lighting as shown on the plans and indicated in the specifications. The proposed work includes: Reconstructing approximately 2,000 feet of Ward Road as a 2-lane roadway from NW Blue Parkway to NW O Brien Road with either bike lanes or an unmarked wide curb lane to accommodate bicycles. The project includes, but is not limited to, paving, sidewalks, curb and enclosed storm drains, street lighting, installation of water line, sanitary sewer and other livable street components. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 from the current version of the Missouri Standard Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening A certified or cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The City of Lees Summit, Missouri reserves the right to reject any or all bids. The DBE Goal for this project is 6% and 1 On-the-job trainee. No 2nd tier subcontracting will be allowed on this project. MODOT - NW Ward Road Improvements Questions must be received by 5:00 p.m. on Thursday, October 16, 2025. Questions are to be addressed to Scott Eason at scott.eason@cityofls.net.
Bid Results
Roads / Highways
$4,913,531.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 23, 2025
December 22, 2025
NW Ward Rd, Lees Summit, MO
Related To This Project
Lees Summit, MO
Bid Date: Oct 23 2025
Lees Summit, MO
Bid Date: Oct 13 2025
Lees Summit, MO
Bid Date: Oct 22 2025
Lees Summit, MO
Bid Date: Oct 24 2025
Lees Summit, MO
Bid Date: Nov 06 2025
Lees Summit, MO
Bid Date: Dec 09 2025
Lees Summit, MO
Bid Date: Nov 24 2025
Lees Summit, MO
Bid Date: Nov 18 2025
Lees Summit, MO
Bid Date: Apr 21 2020
Lees Summit, MO
Bid Date: Dec 22 2020
Lees Summit, MO
Bid Date: Sep 10 2020
Lees Summit, MO
Bid Date: Aug 07 2020
Lees Summit, MO
Bid Date: Mar 11 2021
Lees Summit, MO
Bid Date: Oct 10 2025
Lees Summit, MO
Bid Date: Oct 01 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.