BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Site work and new construction of a laboratory facility in Forest Park, Georgia. Completed plans call civil work for a laboratory facility.

The following is a list of some, but not limited to, of the representative services to be provided by the PM: A. General Duties: The PM will perform a variety of duties within the following broad areas: a. Identify program concepts and associated budgets; validate that this Project is financially feasible. b. Prepare a task-related project delivery schedule. c. Deliver a fully developed program to the Owner and The Using Agency. d. Develop and implement a cost management (cost containment) strategy that will identify and track decisions that have an impact on cost. e. Work with user-group representatives and prepare a program validation schedule in conjunction with the Owner and The Using Agency. f. Represent the interests of the Owner and The Using Agency user groups during the preparation of schematic and design development plans and construction drawings. g. Develop a framework for negotiating the guaranteed maximum price (GMP) and, if appropriate, the subsequent lump sum contract with the CM/GC. h. Provide construction administration services to monitor and manage construction activities that will affect the Project’s cost, schedule, and quality. i. Coordinate the final building punch-list, including any commissioning and all operating systems on behalf of the Owner and The Using Agency with a full and complete set of all building-related documents at occupancy; provide electronic file copy of the same (electronic file provided by design professional of record including “as-built” drawings). k. Perform activities not specifically identified but that are necessary and convenient to the best interests of the Owner and The Using Agency in completing the Project.

Post-Bid

Laboratories

$34,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
161
Bidding Soon
2,344
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

December 19, 2025

Project location map

To be determined, Forest Park, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.