Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 3, 2025 at 7:00 PM
Updated November 4, 2025
Site work and paving for a mixed-use development in Broken Arrow, Oklahoma. Completed plans call for site work for a one-story above grade water / sewer project; and one-story above grade water / sewer project.
OLD TOWN HOUSTON ST. 12" WATERLINE AND BORE IMPROVEMENTS FORT WORTH ST. TO S. 9TH ST: Project includes installation of approximately 150 Linear Feet (LF) of 12" PVC Waterline and 77 LF of Bored 24" Steel Casing. This project also includes waterline service connections, erosion control, concrete work, and other utility construction activities. This project is located along Houston Street from Forth Worth Street to South 9th Street in Broken Arrow, OK. Construction time for this contract will be One Hundred Fifty (150) Calendar days. Old Town Houston St. Stormwater Improvements Fort Worth St. to S. 9th St.: Project includes excavation, grading, drainage channel, approximately 614 Linear Feet of 18" polypropylene drainage pipe, and culverts. Project also includes erosion control, removal and replacement of sidewalks and driveways, construction staking, and other utility construction activities. Project is to address erosion along the channel and improve stormwater flow along Houston St. This project is located along Houston Street from Forth Worth Street to South 9th Street in Broken Arrow, OK. Construction time for this contract will be One Hundred Fifty (150) Calendar days. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to the City of Broken Arrow. The successful Bidder must, within ten (10) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by City of Broken Arrow in the amounts equal to the Contract price.
Bid Results
Sidewalks / Parking Lot
$519,979.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 23, 2025
November 24, 2025
E Houston St, Broken Arrow, OK
Related To This Project
Broken Arrow, OK
Bid Date: Oct 29 2025
Broken Arrow, OK
Bid Date: Jan 07 2026
Broken Arrow, OK
Bid Date: Oct 29 2025
Broken Arrow, OK
Bid Date: Oct 22 2025
Broken Arrow, OK
--
Broken Arrow, OK
--
Broken Arrow, OK
--
Broken Arrow, OK
Bid Date: Oct 21 2025
Broken Arrow, OK
Bid Date: Oct 22 2025
Broken Arrow, OK
Bid Date: Oct 29 2025
Broken Arrow, OK
Bid Date: Oct 10 2025
Broken Arrow, OK
Bid Date: Sep 17 2025
Broken Arrow, OK
Bid Date: Oct 07 2025
Broken Arrow, OK
Bid Date: Sep 30 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
