BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 3, 2025 at 7:00 PM

Updated November 4, 2025

Site work and paving for a mixed-use development in Broken Arrow, Oklahoma. Completed plans call for site work for a one-story above grade water / sewer project; and one-story above grade water / sewer project.

OLD TOWN HOUSTON ST. 12" WATERLINE AND BORE IMPROVEMENTS FORT WORTH ST. TO S. 9TH ST: Project includes installation of approximately 150 Linear Feet (LF) of 12" PVC Waterline and 77 LF of Bored 24" Steel Casing. This project also includes waterline service connections, erosion control, concrete work, and other utility construction activities. This project is located along Houston Street from Forth Worth Street to South 9th Street in Broken Arrow, OK. Construction time for this contract will be One Hundred Fifty (150) Calendar days. Old Town Houston St. Stormwater Improvements Fort Worth St. to S. 9th St.: Project includes excavation, grading, drainage channel, approximately 614 Linear Feet of 18" polypropylene drainage pipe, and culverts. Project also includes erosion control, removal and replacement of sidewalks and driveways, construction staking, and other utility construction activities. Project is to address erosion along the channel and improve stormwater flow along Houston St. This project is located along Houston Street from Forth Worth Street to South 9th Street in Broken Arrow, OK. Construction time for this contract will be One Hundred Fifty (150) Calendar days. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to the City of Broken Arrow. The successful Bidder must, within ten (10) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by City of Broken Arrow in the amounts equal to the Contract price.

Bid Results

Sidewalks / Parking Lot

$519,979.00

Public - City

Paving, Site Work

71

9

4

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
101
Bidding Soon
1,128
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

November 24, 2025

Project location map

E Houston St, Broken Arrow, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.