Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Renovation of a fire / police facility in Baltimore, Maryland. Completed plans call for the renovation of a one-story above grade fire / police facility.

Make all necessary disconnects, removals, and modifications to allow for installation of a complete electrical system as generally described below and shown on the attached mechanical and electrical plans dated 11/13/2024. The work should include, but is not limited to, the following: 1. New code compliant 400 amp 120/240v 1-phase 3-wire service, with a new 400-amp MCB panel, 2 new 125-amp panels and breakers, necessary BGE boxes, cables and cabinets. Complete all grounding as shown on the plans and as required by NEC and applicable local codes. 2. Furnish & install all wiring and accessories, receptacles, switches, light fixtures, lamps and controls as shown on the plans. 3. Furnish & install all wiring and accessories, disconnects to connect mechanical and plumbing equipment as shown on the plans. The Contractor proposes to substantially complete all of the work within ninety (90) days after issuance of the Notice to Proceed. If you have any questions, please contact James Bassetti @ 443-615-1870 or 410-396-1292. as per Adda 1, All questions concerning HABC IFB PUR-1533-25 are due via Bonfire by 2:00 p.m. EST on Friday October 17, 2025.

Bid Results

Fire / Police

$162,400.00

Public - City

Renovation

37

4

21

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
710
Active Projects
261
Bidding Soon
4,764
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2025

November 24, 2025

Project location map

1908 Hollins St, Baltimore, MD

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed