Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 6, 2025 at 7:00 PM
Updated November 7, 2025
Site work for a water / sewer project in Lafayette, Colorado. Completed plans call for site work for a one-story above grade water / sewer project.
The City of Lafayette is accepting bids for the Baseline Water Treatment Plant Upgrades. The work includes, but is not necessarily limited to, furnishing labor, materials, and equipment for the construction of upgrades to the Baseline Water Treatment Plant. General requirements include installation, insurance, and license. Bidders must provide a bid bond (5%), performance bond (100%), and payment bond (100%). Attendance at a mandatory pre-bid conference is required. Bid submissions must be made electronically. Question Acceptance Deadline 10/14/2025 08:00 PM EDT DESCRIPTION OF WORK The Work includes, but is not necessarily limited to furnishing labor, materials and equipment for the construction of upgrades to the Baseline Water Treatment Plant. Work includes, but is not limited to addition of a Filter Influent Butterfly Valve, Filter No. 1 Trough Replacement, addition of a Filter Backwash Piping Restraint System, Clearwell Influent Pipe Lining and Butterfly Valve Replacement, and construction of a Meter Vault Building. Work shall also include installation of all electrical wiring, process piping, associated site work, and all appurtenances required for a fully functional system, relating to the improvements as detailed in the drawings and specifications. Treatment and process area shutdowns will be required to complete the scope of work. All shutdowns shall be coordinated with City operations staff. The Contractor shall submit a detailed work plan/sequence for each shutdown and receive the Engineer's approval at least 30 days prior to the planned date of shutdown. For each approved shutdown, the Contractor shall submit a written confirmation notification 14-days in advance of the proposed shutdown to the City. Weekend and night work may be required. 1. Minimize shutdown times by thorough advanced planning. Have required equipment, materials, and labor on hand at time of shutdown. 2. Disruptions include, but are not limited to: a. Removing from service, restricting, or impeding the function of utility or water systems serving any portion of the plant facilities, and b. Delaying or denying access to any plant structure or area needed by plant staff to complete their work assignments. . Where required to minimize treatment process interruptions while complying with specified sequencing constraints, provide temporary pumping, power (including standby power for critical systems), lighting, controls, instrumentation, and safety devices. . Filter Influent Butterfly Valve 1. Work for this connection will be coordinated with the City for approval before start of construction and shall include means and methods to minimize Water Treatment Plant down time. Work must be completed prior to April 1 . Filter No. 1 Trough Replacement 1. Work for this connection will be coordinated with the City for approval before start of construction and shall include means and methods to minimize time filter is off-line. Work must be completed prior to April 1. . Filter Backwash Piping Restraint System 1. Work for this connection will be coordinated with the City and Engineer for approval before start of construction. . Clearwell Influent Pipe Lining and Butterfly Valve Replacement 1. Work must be completed prior to April 1 2. Work for this connection will be coordinated with the City for approval before start of construction dewatering of the existing effluent splitter box in preparation for the lining of the clearwell influent pipe, to minimize Water Treatment Plan down time. 3. Work to remove the butterfly valve and line the pipe will be allowed for a maximum timeframe of 18 hours. 4. Replacement of the butterfly valve can occur on a separate day for a maximum timeframe of 4 hours. . Meter Vault Building 1. The installation of the meter shall be fully planned and coordinated with the City for approval before start of construction and shall include means and methods to minimize time that storage tank is off-line. The meter may not be installed between April 1 and October 31. 2. Frost protection must be provided for 30-inch waterline and 8-inch sanitary sewer while site is excavated. . Sequences other than those specified will be considered by Engineer, provided they afford equivalent continuity of operations.
Award
Water / Sewer
$1,814,140.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2025
December 22, 2025
1290 S Public Rd, Lafayette, CO
Related To This Project
Lafayette, CO
Bid Date: Dec 03 2025
Lafayette, CO
--
Lafayette, CO
Bid Date: Nov 25 2025
Lafayette, CO
Bid Date: Nov 24 2025
Lafayette, CO
Bid Date: Jan 29 2026
Lafayette, CO
Bid Date: Jan 30 2026
Lafayette, CO
Bid Date: Feb 27 2026
Lafayette, CO
Bid Date: Oct 31 2025
Lafayette, CO
Bid Date: Sep 22 2025
Lafayette, CO
--
Lafayette, CO
Bid Date: Aug 29 2025
Lafayette, CO
Bid Date: Jan 14 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
