BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Renovation of an educational facility in Northampton Township, Pennsylvania. Working plans call for the renovation of a educational facility.

** As of December 5, 2025 There have not been any shortlisted construction managers. The project is scheduled to go to bid in January 2027.** The scope of work includes the Construction Manager serving as the School Districts professional representative for the project and to provide professional consultation and advise from pre-design through the final completion of the project. The desired services are generally defined in the AIA C132 Standard Form of Agreement Between the Owner and Construction Manager as Advisor. Construction Manager responsibilities will include, but not limited to, the following: Phasing of Scope of Work A. Design Phase 1 - Programming and Schematic Design (SD) Attend Project Oversight Committee meetings on a regular basis with the School District, Architect, and other consultants to discuss and review all items pertinent to the SD. The Construction Manager will prepare and distribute minutes. Survey and become familiar with the Council Rock School District to better provide information regarding the schematic design, phasing, and systems design. Work closely with the School District personnel and Architect to develop project criteria and program requirements. Prepare a preliminary overall project schedule including pre-design, design, and construction phases. Prepare an estimate of probable cost for planning the project. Prepare preliminary conceptual planning, including phasing requirements. The Construction Manager will work in conjunction with the School District, District personnel, and Architect to clearly define the program for the project which can be used to establish preliminary design information for the Design Team. Construction Manager to work closely with the School District to develop the owners project requirements and detailed outline specifications In conjunction with the Civil Engineer, perform preliminary investigations of local and state agency requirements, such as zoning requirements, land development, and planning commission, DEP, etc. for establishing schedules and submittals. Assist with verification of site conditions. The preliminary program is attached (Attachment 2). The final program needs to be developed by the Architect and will require review and adjustment during the programming and schematic design phase. RFP Construction Management - Council Rock High School South Phase 2 Stadium Renovations Question Deadline 10/31/2025 at 2:00 PM ET Response to All Questions Issued via Addendum November 6, 2025

Final Planning

Educational

$5,600,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2025

June 5, 2026

Project location map

2002 Rock Way, Northampton Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.