BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2025 at 7:00 PM

Updated November 23, 2025

Site work for a water / sewer project in Carrollton, Georgia. Completed plans call for site work for a water / sewer project.

Only contractors deemed as Qualified Contractors to provide Drainage Rehabilitation, Repair, Replacement & Miscellaneous Maintenance Services through the routine maintenance prequalification process are eligible to participate in this Invitation to Bid/Request for Quote. Deadline for Written Questions from Contractors 10/13/2025 2:00 PM Responses to Written Questions to Contractors 10/15/2025 5:00 PM Work must begin no later than: 30 Days After Prework Meeting Work must be completed no later than: 150 Days After Prework Meeting Bid Bonds or Proposal Guarantys are no longer required Performance and Payment Bond A Performance Bond and a Payment Bond each equal to 100% of the Award Price, must be provided by the successful Bidder The Department reserves the right to modify existing provisions or include additional provisions, which are not currently addressed herein and further reserves the right to reject any or all bids, and to waive technicalities and informalities at its discretion. Location/County Carroll,Paulding Route SR 16 SR 120 Description Jack or Bore 2 Pipe(s) -See Exhibit 4 Jack or Bore 1 Pipe(s) - See Exhibit 4 Fine Aggregate Sources, Ready Mix Concrete Plants (Districts 1 - 7), Pipe Joint Sealers and Gaskets ,Hot Mix Asphalt Concrete Plant, Thermoplastic Drainage Pipe Producers , Concrete Pipe, Precast Manhole and Miscellaneous Precast Products , Guardrail Product,Reinforcement Steel Fabricators , Silt Fence Fabrics and Type C Systems The Contractor will be required to perform prep work, removal, installation and cleanup for Drainage Rehabilitation, Repair, Replacement, & Miscellaneous Maintenance Services defined in this ITB. The Contractor shall supply labor, equipment, tools, means of transportation, traffic control, and incidentals to perform work in accordance to specifications, and to ensure a safe work environment for employees and the traveling public within the time schedule specified. 1. Scope Work under this ITB consists of furnishing all labor, materials, tools, equipment, means of transportation, and incidentals necessary to perform the services. Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel. The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Drainage Rehabilitation, Repair, Replacement, & Miscellaneous Maintenance Services at such time, and at such location(s) as directed by the Engineer. Prior to start of work, Contractor must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose. The Contractor will also be responsible for any traffic control, licenses, and permits required to satisfy the duties required herein. Deliverables Delivery of Drainage Rehabilitation, Repair, Replacement, & Miscellaneous Maintenance Services shall be in accordance with the contract terms. The following deliverables are expected for work performed at the locations referenced in Exhibit 4 - Locations, Descriptions and Estimated Quantities.

Award

Water / Sewer

$477,049.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
98
Bidding Soon
1,854
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2025

November 20, 2025

Project location map

Multiple Locations, Carrollton, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.