BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 6, 2025 at 8:00 PM

Updated October 7, 2025

Site work and paving for a mixed-use development in Homer, Alaska. Working plans call for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and road / highway.

The Homer All-ages and Abilities Pedestrian Pathway project, funded by the Transportation Alternatives Program via DOT&PF, entails the construction of a 5-foot wide, approximately 4,950 feet long asphalt sidewalk with crosswalk improvements across various locations to enhance pedestrian safety. This initiative includes adding concrete curbs, gutters, ADA-compliant ramps, and upgrading crosswalks with Rectangular Rapid Flashing Beacons and high-visibility markings. Additionally, it requires renovating certain city-maintained storm drains for effective stormwater management. Key areas of work are Main Street, Bunnell Avenue, Sterling Highway at Hazel Avenue, Svedlund Street, and he local streets of Herndon Drive and Lee Drive, aiming to improve connectivity and safety for pedestrians. Work Type : Pavement Reconstruction As of October 06, 2025, the project is in Final Planning status. Anticipated letting Year is 2025 AKDOT - Homer All-Ages and Abilities Pedestrian Pathway (Happ) [TAP Award 2023] *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Roads / Highways

$3,875,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
1
Bidding Soon
40
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2026

Project location map

Multiple Locations, Homer, AK


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.