BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 6, 2025 at 8:00 PM

Updated October 7, 2025

Site work and paving for a road / highway in Hearst, Ontario. Conceptual plans call for paving for a road / highway; and for site work for a road / highway.

Construction of a full access road to the Ring of Fire, 184 km of new all-season roads as well as upgrades to existing roads. The included road projects are: Webequie Supply Road (WSR) - a proposed all-season road connecting the First Nation to the Ring of Fire mining area. Northern Road Link (NRL) - A proposed road building from a section of the proposed Martin Falls community access road to the Ring of Fire. Marten Falls Community Access Road (MFCAR) - A proposed community all-season road. Anaconda & Painter Lake Roads (APLR) - Proposed upgrades to the existing roads. TIMELINE: Final EA/IS submissions are anticipated for the MFCAR and WSR in early 2026, with the NRL to follow in early 2028. Based on these timelines the earliest possible EA decisions could be anticipated is in 2026 and 2028. Should EA approvals be received the project would then move to technical permitting and construction phases. In 2025, MTO is planning EA work for upgrades to the existing Anaconda and Painter Lake forestry access roads that are proposed to connect the new roads via the MFCAR to the provincial trunk highway network. SNC Lavalin and Dillon Consulting conducted the environmental assessment and are working on the preliminary design services for Northern Road Link project. Southern Link Study was completed by SNC-Lavalin. The 126-km northern link portion of the route won’t finish its studies and assessments until the beginning of 2028. The Geraldton Main Street Rehabilitation Project will be the first segment on the road network to the Ring of Fire, it can be followed under a separate report. Virtual open houses will occur yearly. Studies are ongoing. Construction not expected until beyond 2028.

Conceptual

Roads / Highways

$2,000,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
5
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2028

Project location map

North of Thunder Bay, 540 kilometres, Hearst, ON


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.