BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 9, 2026 at 7:00 PM

Updated February 10, 2026

Site work and paving for a road / highway in Hearst, Ontario. Conceptual plans call for paving for a road / highway; and for site work for a road / highway.

Construction of a full access road to the Ring of Fire, 184 km of new all-season roads as well as upgrades to existing roads. The included road projects are: Webequie Supply Road (WSR) - a proposed all-season road connecting the First Nation to the Ring of Fire mining area. Northern Road Link (NRL) - A proposed road building from a section of the proposed Martin Falls community access road to the Ring of Fire. Marten Falls Community Access Road (MFCAR) - A proposed community all-season road. Anaconda & Painter Lake Roads (APLR) - Proposed upgrades to the existing roads. TIMELINE: Final EA/IS submission for the WSR occurred January 2026 and it is under review. Final EA/IS submission for the MFCAR anticipated early 2026 as well, with the NRL to follow in early 2028. Should EA approvals be received the project would then move to technical permitting and construction phases. In 2025, MTO is planning EA work for upgrades to the existing Anaconda and Painter Lake forestry access roads that are proposed to connect the new roads via the MFCAR to the provincial trunk highway network. SNC Lavalin and Dillon Consulting conducted the environmental assessment and are working on the preliminary design services for Northern Road Link project. Southern Link Study was completed by SNC-Lavalin. The 126-km northern link portion of the route won’t finish its studies and assessments until the beginning of 2028. The Geraldton Main Street Rehabilitation Project will be the first segment on the road network to the Ring of Fire, it can be followed under a separate report. Virtual open houses will occur yearly. Studies are ongoing. Pending EA/IS approvals and design completion, construction activites could begin as early as June 2026.

Conceptual

Roads / Highways

$2,000,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
2
Bidding Soon
5
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2026

Project location map

North of Thunder Bay, 540 kilometres, Hearst, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.