Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 9, 2026 at 7:00 PM
Updated February 10, 2026
Site work and paving for a road / highway in Hearst, Ontario. Conceptual plans call for paving for a road / highway; and for site work for a road / highway.
Construction of a full access road to the Ring of Fire, 184 km of new all-season roads as well as upgrades to existing roads. The included road projects are: Webequie Supply Road (WSR) - a proposed all-season road connecting the First Nation to the Ring of Fire mining area. Northern Road Link (NRL) - A proposed road building from a section of the proposed Martin Falls community access road to the Ring of Fire. Marten Falls Community Access Road (MFCAR) - A proposed community all-season road. Anaconda & Painter Lake Roads (APLR) - Proposed upgrades to the existing roads. TIMELINE: Final EA/IS submission for the WSR occurred January 2026 and it is under review. Final EA/IS submission for the MFCAR anticipated early 2026 as well, with the NRL to follow in early 2028. Should EA approvals be received the project would then move to technical permitting and construction phases. In 2025, MTO is planning EA work for upgrades to the existing Anaconda and Painter Lake forestry access roads that are proposed to connect the new roads via the MFCAR to the provincial trunk highway network. SNC Lavalin and Dillon Consulting conducted the environmental assessment and are working on the preliminary design services for Northern Road Link project. Southern Link Study was completed by SNC-Lavalin. The 126-km northern link portion of the route won’t finish its studies and assessments until the beginning of 2028. The Geraldton Main Street Rehabilitation Project will be the first segment on the road network to the Ring of Fire, it can be followed under a separate report. Virtual open houses will occur yearly. Studies are ongoing. Pending EA/IS approvals and design completion, construction activites could begin as early as June 2026.
Conceptual
Roads / Highways
$2,000,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 3, 2026
North of Thunder Bay, 540 kilometres, Hearst, ON
Related To This Project
Hearst, ON
Bid Date: Nov 20 2025
Hearst, ON
Bid Date: Dec 08 2025
Hearst, ON
Bid Date: Feb 26 2026
Hearst, ON
Bid Date: Mar 19 2026
Hearst, ON
Bid Date: Mar 26 2026
Hearst, ON
Bid Date: May 05 2026
Hearst, ON
Bid Date: Apr 20 2026
Hearst, ON
Bid Date: May 29 2026
Hearst, ON
Bid Date: Oct 23 2025
Hearst, ON
Bid Date: Jul 14 2025
Hearst, ON
Bid Date: Jun 24 2025
Hearst, ON
Bid Date: Jun 12 2025
Hearst, ON
Bid Date: Mar 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
