BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2025 at 8:00 PM

Updated October 21, 2025

Demolition and site work for a residential development in Kingsport, Tennessee. Completed plans call for the demolition of a residential development; and for site work for a residential development.

Complete Demolition and Disposal of Debris Associated With the Structures Located at: 3304 Watterson Street Kingsport, Tennessee 1 Jb 1361 Willow Street Kingsport, Tennessee. Price to Include Removal of All Structures Including Outbuildings, Clear Lot of Small Brush, Debris, as Well as Junk/garbage on the Exterior of All Listed Properties. All Demolition and Disposal of Debris Shall Be in Compliance With All Local, State and Federal Guidelines and or Requirements. Landfill Tickets Must Be Submitted With the Final Invoice to Ensure an Approved Demolition Landfill is Being Utilized. If There Are Multiple Locations, Please Price Each Separately. We May Need to Remove One or More Locations if They Are Torn Down by the Owner(S) in the Interim. The City Retains the Right to Award to Multiple Vendors. Work Shall Be Completed No Later Than Thirty (30) Calendar Days After Award. Bidders desiring to visit the work area may contact Keith Bruner at (423) 229-9320 to make arrangements to visit the work area. Extras will not be allowed. 1. The purpose of this document is to acquire the services of an independent contractor to furnish all necessary labor, tools, equipment, and supplies to demolish the structure and perform other related work as identified. 2. The City reserves the right to suspend all work in whole or part if deemed necessary for the best interest of the City of Kingsport. This suspension will be without compensation to the Contractor, other than to adjust the contract completion/delivery requirements. 3. The Contractor shall keep the premises clean of all rubbish and debris generated by the work involved and shall leave the premises neat and clean. All material, rubbish, and debris including concrete footings/slabs shall be removed from the site and disposed of by the contractor at the contractor's expense. Basements shall have the masonry block removed to include footings/slabs and be backfilled with approved material. The work area shall be cleaned at the end of each work day. All materials, tools, equipment, etc. shall be removed or safely stored. The City is not responsible for theft or damage to the Contractor's property. All possible safety hazardsto workers or the public shall be corrected immediately and left in a safe condition at the end of each work day. If there is a question in this area, the project manager will be consulted. 4. Work hours shall be coordinated with the project manager. Any changes to the established schedule must have prior approval of the project manager. 5. Allsewer, water and gas connectionsshall be left in accordance with the requirements of the utility involved. Sewer, water and gas connections must be visibly capped at the property line, inspected and subsequently backfilled. 5.1 All sidewalks, driveway entrances, alley entrances, curbs and gutters, and streets that are to remain but which are damaged by the contractor during his operationsshall be repaired to the satisfaction of the project manager. Sidewalks and streets shall be swept clean to prevent injury to pedestrians. 5.2 In order to control dust, the contractorshall apply adequate dust palliative (such as water) to the ground and to the debris in an amount sufficient to lay dust incident to demolition and lot cleaning. 6. No improvements or salvage materials shall be moved and parked or stored on any nearby City-owned, publicly-owned, or privately-owned parcel of land, either by the contractor, subcontractor, or buyer of the salvage materials/ improvements without written permission from the owner. Likewise, equipment and materials or debris removed during demolition operations shall not be placed or dumped on either City, private or public property unless it is an approved demolition landfill. Payment of any monies due will be held until all demolition equipment, materials and debris have been removed to the satisfaction of the City. 7. If the contractor damages underground facilities, he shall be responsible for all repairs. The contractor should contact Tennessee One Call and public and private utility companies to avoid damage. 8. All applicable fees and/or permit costs are to be included in the contractor's quoted offer. Fees for access to the City of Kingsport's demolition landfill shall be in the price offer. Fees for disposal of hazardous material shall be in the price offer. 9. Hazardous materials are defined as any product representing a health or physical hazard, and requires special handling and disposal under the E.P.A. & T.D.E.C. guidelines. The contractor must immediately advise the project manager when hazardous materials are found at the demolition/clean-up site, other than TV sets and equipment. The TV sets and related equipment will not be placed in the City's demolition site but disposed of per direction of Tennessee Department of Environment and Conservation. 10. The City shall not be responsible for the loss of any salvageable materials because of theft, vandalism, fire or any other reason. 11. The Contractor will pay all sales, consumer, use and other similar taxes required by law of the place where the work is performed. Grading and reseeding - Once demolition is completed the lot shall be graded in a manner where it can be mowed. The contractor shall place grass seed and straw once final grading has been completed and approved. Contractor shall, at City's discretion, return to the property up to two (2) times within 12 months of completion of the work to reapply grass seed and straw if City determines the property has not been restored to a like and similar condition as existed prior to commencement of the work. Contractor shall re-seed the affected area within 45 days of notice from the City of the need to re-seed the area. Bid Result 3304 Waterson Street , 1361 Willow Street Sitework Services, Inc. $10,640

Bid Results

Residential Subdivision

$10,640.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
79
Bidding Soon
906
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.