BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 11, 2025 at 7:00 PM

Updated November 12, 2025

This is a service / maintenance or supply contract in Decatur, Georgia. Contact the soliciting agency for additional information.

Portions of the Atlanta Metropolitan Transportation Planning Area are in maintenance for both ozone and PM2.5 standards under the Clean Air Act under the Clean Air Act Amendments of 1990. Because of this designation, the region must look toward better development practices that support increased use of transportation modes other than single occupant vehicles (SOV) to help reduce emissions and meet air quality requirements. The LCI Program seeks to increase the use of alternatives to driving alone by developing transportation projects and other programs to improve accessibility, expand mixed-uses, utilize transit and support further development in the study area. Evaluation of the existing structure and development of likely scenarios should produce recommendations for future investment that support ARC's Livable Centers Initiative Program. Improving safety and walkability will result in increases of the alternatives to driving alone. DeKalb County Government (the County) requests qualified individuals and firms with experience in planning, zoning ordinances/development regulations, market analysis, and community engagement, with an emphasis on both regional and local project experience to submit proposals for the Kensington LCI Master Plan Study Update. The County seeks a consultant to develop the Kensington LCI Master Plan, focusing on the approximately 870-acre Kensington LCI area in unincorporated Decatur, Georgia, beyond the 35-acre TOD (Transit-Oriented Development) area. This plan update will reflect the area's growth and transformation over the past decade and will emphasize redevelopment opportunities, particularly for a large County-owned catalytic site (Government Center) located near the Kensington MARTA station. The study will be based on this defined geographic area and will inform all project activities and recommendations. Services shall commence within ten (10) calendar days following written notice to proceed and must be completed within one (1) year. Question Submission Deadline: October 17, 2025, 5:00pm. The County reserves the right to make one (1) award or multiple awards. The method of Contractor Selection has not been Determined at this time.

Conceptual

Municipal

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
139
Bidding Soon
1,878
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2025

Project location map

To be determined, Decatur, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.