BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 21, 2025

Site work for a road / highway in Pasadena, California. Working plans call for site work for a road / highway.

**As of November 20, 2025, bids were canceled. No definite date for the rebid.** Question Submission Deadline October 21, 2025, 2:00pm The Walnut Street Corridor Signal Improvement Project includes the design and implementation of ITS assets along the corridor and integration of these assets into the DOT multi-modal transportation network. Integration will feature point to point connectivity through fiber optics for communications, upgrades in traffic signal hardware, inclusion of video surveillance systems, addition of high resolution data-capable traffic signal controllers, specialized applications using video algorithms for traffic safety analytics and collision prediction, overall vehicular detection, and the inclusion of short wave radios for future Vehicle to Everything (V2X) applications and communications. The proposed project will provide signal equipment upgrades along the corridor of Walnut Street between Fair Oaks Avenue and Greenwood Avenue. Walnut Street is a major east-west corridor south of the I-210 freeway serving as a connector between the major north-south corridors of Orange Grove Boulevard and Fair Oaks Avenue and the I-210 on-and-off ramps at Lake Avenue, Hill Avenue, Allen Avenue, and Sierra Madre Boulevard. It is also one of the main corridors for ingress and egress to the Rose Bowl and is used heavily for stadium-related special events. Electronic Bid bond is required. Bidders must provide all required information for the City to verify the bond with their bid. The bond must meet the following requirements and characteristics: Bid security in the amount of five-percent (5%) of the total bid price in the form of a redeemable or callable electronic surety bond, meeting City requirements, must accompany all bids. Contract Bonds - The successful Bidder will be required, within fifteen (15) days after the date of the award, to sign a contract for doing the work and file bonds as specified by Section 1-7.2, entitled Contract Bonds, of the "GREENBOOK". The Material and Labor Bond and the Faithful Performance Bond shall be for one-hundred percent (100%) of the contract amount consisting of the base bid stated in the Bidder's Proposal. Question Deadline 10/21/2025 at 2:00 PM PT Questions must be submitted via online. Pre bid meeting notes: Dial in by phone +1 213-493-7443,,940475926# United States, Los Angeles Find a local number Phone conference ID: 940 475 926#

Final Planning

Roads / Highways

$2,748,417.00

Public - City

Site Work

50

6

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
569
Active Projects
92
Bidding Soon
3,715
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2025

May 20, 2026

Project location map

Multiple Locations, Pasadena, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.