Published November 10, 2025 at 7:00 PM
Updated November 11, 2025
Site work and renovation of a water / sewer project in Garner, Iowa. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.
Uv Disinfection Modification Project Project includes all labor, materials, and equipment necessary to remove and salvage the existing UV disinfection system equipment, installation of new UV disinfection system equipment miscellaneous associated work including start up, training and cleanup. Project is located at the existing Wastewater Treatment Facility on the South side of Lyon Street east of Drainage Ditch No. 5. Each proposal shall be accompanied by a bid security in a sealed envelope by either (1) a certified or cashier's check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to 5% of the bid, or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of 5% of the bid. Contractor shall determine amount of bid bond based on the amount of the base bid and all alternate construction bid items The successful bidder will be required to furnish a bond in an amount equal to one hundred (100) percent of the contract price, said bond to be issued by a responsible surety approved by the City Council and listed in the U.S. Treasury Department's most current list (Circular 570, as amended) and authorized to transact business in the State of Iowa and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the work and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period as required by the specifications after its completion and acceptance by the City Council Notice to Proceed will be issued by November 12, 2025. Work for all items shall be substantially completed no later than February 27, 2026. Liquidated damages in the amount of Five Hundred Dollars ($500) per calendar day will be assessed for each calendar day that work on the total project, or portions of the contract where specific completion dates are specified or otherwise agreed to, that remain substantially uncompleted after the end of the contract period, with due allowance for extensions of the contract period due to conditions beyond the control of the contractor. The City reserves the right to reject any or all bids, to waive informalities or technicalities in any bid and to enter into such contract as it shall deem for the best interest of the City. The bid security should be made payable to THE CITY OF GARNER, IOWA. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the City as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within 10 days after the award of contract and post bond satisfactory to the City insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and other contract documents. Bidders shall use the bid bond form included in the specifications. Liquidated damages in the amount of Five Hundred Dollars ($500) per calendar day will be assessed for each calendar day that work on the total project, or portions of the contract where specific completion dates are specified or otherwise agreed to, that remain substantially uncompleted after the end of the contract period, with due allowance for extensions of the contract period due to conditions beyond the control of the contractor.
Award
Water / Sewer
$400,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2025
November 12, 2025
W Lyons St, Garner, IA
Related To This Project
Garner, IA
Bid Date: Jan 08 2026
Garner, IA
Bid Date: Nov 18 2025
Garner, IA
Bid Date: Aug 21 2025
Garner, IA
Bid Date: Jun 18 2025
Garner, IA
Bid Date: Apr 17 2025
Garner, IA
Bid Date: Mar 12 2025
Garner, IA
Bid Date: Feb 18 2025
Garner, IA
Bid Date: Feb 18 2025
Garner, IA
Bid Date: Mar 07 2025
Garner, IA
Bid Date: Dec 12 2024
Garner, IA
Bid Date: Oct 22 2024
Garner, IA
--
Garner, IA
--
Garner, IA
Bid Date: Jan 22 2025
Garner, IA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.