BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2025 at 7:00 PM

Updated November 11, 2025

Site work for an educational facility in Oswego, New York. Completed plans call for site work for a one-story above grade educational facility.

Bid date change from 10/23/2025 to 10/30/2025 as per Adda 1 The Work of Project is defined by the Contract Documents and consists of construction and related alterations and renovations to 1. Oswego High School Building & Site 2. Frederick Leighton Elementary Building & Site B. Type of Contracts Project will be constructed under multiple prime contracts. The Contracts include: a. Mechanical Construction Contract Work - MC-4B b. Electrical Construction Contract Work - EC-4B c. Site Construction Contract Work - SC-4B C. Extent of Multiple Prime Contracts: Unless the Agreement contains a more specific description of the Work, names and terminology on Drawings and in Specification Sections determine which contract includes a specific element of Project. 1. Unless otherwise indicated, the Work described in this Section for each contract shall be complete systems and assemblies, including products, components, accessories, and installation required by the Contract Documents. HS: 46-13-00-01-0-018-029 FLS: 46-13-00-01-0-005-019 Site Construction, Electrical Construction, Mechanical Construction are required for the 2018 Capital Improvement Project Phase 4b. Bids must be submitted in duplicate and follow the procedures outlined by the 2008 Wicks Reform and contract documents. Bidders may examine contract documents at specified locations and obtain electronic or paper copies for the specified fees. Only complete sets will be issued, and various requirements apply for the return and refund of document deposits. The Owner reserves the right to waive any informality or to reject any or all bids. Bid security must be deposited with the bid in a form and amount subject to contract documents. Completion of work must be by the dates set forth in Section 011100 entitled "Summary of Work." Bidders may inspect the site with advance notice. Requests for interpretation or clarification of contract documents must be made in writing.

Post-Bid

Educational

$10,000,000.00

Public - City

Site Work

54

17

18

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
145
Bidding Soon
1,510
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2025

April 6, 2026

Project location map

Multiple Locations, Oswego, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.