Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Site work and new construction of a mixed-use development in Newton, Texas. Completed plans call for the construction of a clubhouse / community center; for site work for a clubhouse / community center; communication facility; and communication facility.

Scope The proposed building will function as a Community Service Facility and a Shelter of Last Resort for persons in the after-math of disaster events. The facility will include the following key spaces: Multipurpose rooms, Breakout rooms, Kitchen with Pantry, Restrooms and Storage. Question Deadline 10/29/2025 at 12:00 PM CT No oral interpretations will be made to any bidder. Each request for clarification shall be made in writing to the Grant Recipient or engineer no less than seven (7) days prior to the bid opening. Each interpretation made will be in the form of an Addendum to the contract documents and will be distributed to all parties holding contract documents no less than seven (7) days prior to the bid opening. 1. Work areas staked out and batter boards set. 2. Clearing of work areas. 3. Stripping of topsoil. 4. Placement of each lift of select fill material. 5. Drilling of footings. 6. Placing of any concrete. 7. Placing of paving materials. 8. City inspection and covering of any underground services. 9. Completion of roughing in of plumbing, heating, air conditioning and electrical work (prior to concealment). 10. Laying of masonry. 11. Roofing and sheet metal work. 12. Covering of insulation. 13. Installation of glazing. 14. Installation of doors. 15. Installation of millwork. 16. Installation of resilient flooring. 17. Painting (each coat). 18. Completion of fine grading of site, prior to the installation of seed or sod. 19. Installation of electrical fixtures. 20. Installation of equipment. 21. Installation of furnishings. 22. Installation of heating, ventilating, and air conditioning units. 23. Installation of plumbing fixtures Completion- (120) consecutive calendar days

Award

Clubhouse / Community Centers

$8,806,705.00

Public - County

New Construction, Site Work

72

37

10

7

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
42
Bidding Soon
694
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2025

December 5, 2025

Project location map

2240 St Hwy 87 N, Newton, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed