Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 4, 2025 at 7:00 PM
Updated December 5, 2025
Renovation of a water / sewer project in Des Plaines, Illinois. Completed plans call for the renovation of a water / sewer project.
Electrical Power Distribution and Phosphorus Removal Improvements Any questions regarding the downloading of the Contract Document should be directed to the following email: contractdesk@mwrd.org or call 312-751-6643. Estimated Cost: Between $22,309,150.00 and $27,005,813.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Metropolitan Water Reclamation District of Greater Chicago reserves the right to reject any or all Proposals if deemed in the publics best interest. Tenders are invited to provide all necessary labor, supervision, tools, equipment, materials and appurtenances to complete the following: A. The work at the Kirie Water Reclamation Plant (KWRP) is as follows: 1. Demolish switchgears M11 North, M11 South and their metal shack housing enclosure. Replace it with a new switchgear system with substation batteries, lighting transformers and other auxiliary equipment with various monitoring and control DCS I/O points. Construct a new Pre-Engineered Metal Building (PEMB) to accommodate the new M11 switchgear, substation batteries, and other auxiliary equipment. New steel exterior materials and finishes will be selected to complement existing face brick masonry context and aesthetic of the Kirie Water Reclamation Plant (KWRP): a. The new building shall have two (2) rooms (Switchgear Room and Battery Room). b. The new building construction will be built over the existing vault. c. Provide new foundation for the PEMB. d. Provide two (2) new wall-mounted air conditioning units with heating capability, to operate independently of one another, to serve the Switchgear Room of the new building. Each unit will be provided with its own thermostat. e. Provide two (2) new wall-mounted air conditioning units with heating capability, to operate independently of one another, to serve the Battery Room of the new building. Each unit will be provided with its own thermostat. f. Install new lighting, required utilities, and required safety systems in new electrical building. g. Install new foundation drain system and building drain cleanouts. h. Construct concrete sidewalk and restore existing grading and landscaping to ensure proper rainfall drainage. i. The temporary wall(s) of the PEMB will be designed to temporarily accommodate Contractor and District sequencing for shutdowns including removal and installation of electrical equipment per Electrical and Structural Contract Documents. j. Fiberglass reinforced polyester (FRP) flush personnel doors without vision lite panels, FRP doors fames and door hardware as approved per District KWRP Maintenance & Operations (M&O) for an Electrical Process Facility are per Contract Documents. k. Provide a minimum clear (14) fourteen feet interior building height. l. Roofing System shall be part of PEMB system, compliant with current State of Illinois Energy Conservation Code (IECC) for code-minimum thermal energy performance. m. Provide interior light weight reinforced Concrete Masonry Unit (CMU) demising partition wall between separate Switchgear Room and Battery Room. n. The new building shall have 2 wall mounted Type (BC) Fire Extinguisher and 1 CO2 Fire Extinguisher. o. The new building shall have awall mounted Powerheart G5 AED. 3. Replace MCC-P21, MCC-P21E, MCC-P22, MCC-P22E, MCC-P23 in the Influent Pump Station Building. Connect new MCC Power Monitors to the DCS. 4. Replace MCC-P31, MCC-P31E, MCC-P33 in the Pre-treatment Building. Connect new MCC Power Monitors to the DCS. 5. Replace the protective relays for Switchgears H21 and H22 in the Influent Pump Station Building. 6. Replace the protective relays for Switchgears H71 and H72 in the Blower Building
Sub-Bidding
Water / Sewer
$27,005,813.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 9, 2025
February 2, 2026
701 W Oakton St, Des Plaines, IL
Related To This Project
Des Plaines, IL
Bid Date: Dec 09 2025
Des Plaines, IL
Bid Date: Oct 29 2025
Des Plaines, IL
Bid Date: Nov 07 2025
Des Plaines, IL
Bid Date: Dec 04 2025
Des Plaines, IL
--
Des Plaines, IL
--
Des Plaines, IL
Bid Date: Dec 16 2025
Des Plaines, IL
--
Des Plaines, IL
Bid Date: Oct 07 2025
Des Plaines, IL
Bid Date: Oct 09 2025
Des Plaines, IL
Bid Date: Oct 28 2025
Des Plaines, IL
--
Des Plaines, IL
Bid Date: Sep 18 2025
Des Plaines, IL
Bid Date: Sep 10 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.