BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2025 at 7:00 PM

Updated November 6, 2025

Demolition, site work, paving and new construction of a civil project in Donaldson, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

The project includes the replacement of an existing bridge with a precast reinforced concrete arch system and associated roadway work. Question Deadline 10/29/2025 at 2:00 PM ET Online Portal Each proposal shall be accompanied by a bidder's bond, or certified check or cashier's check, payable to Frailey Township, in the amount of not less than ten percent of the total amount bid and shall be scanned and uploaded with each bid. The Successful Bidder Will Be Required to Furnish and Pay for Satisfactory Performance and Payment Bonds, Each in the Amount of One Hundred Percent (100%) of the Contract Price With a Corporate Surety Approved by the Owner. Estimated Contract Value: $850K to $1Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The township reserves the right to waive any informality in and to accept or reject any and all bids. The general scope of this project includes the removal and replacement of an existing structure with precast concrete arch culvert with associated roadway and guide rail improvements. Roadway and guide rail improvements will include paving as indicated, placement of guide rail as indicated and placement of rock on stream banks as indicated. The culvert replacement will include demolition of the existing structure and construction of a precast concrete arch culvert with precast end walls. The structure will require roadway reconstruction and guide rail improvements. Other items of work include erosion & sedimentation, traffic control and mobilization/demobilization.

Bid Results

Bridges / Tunnels

$821,517.00

Public - City

Demolition, New Construction, Paving, Site Work

30

22

8

3

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
373
Active Projects
145
Bidding Soon
2,550
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2025

December 4, 2025

Project location map

Clark St, Donaldson, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.