Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 6, 2026 at 7:00 PM
Updated January 7, 2026
Site work for a civil project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.
Reference Number 0000401114 The rehabilitation of the Wagner Concrete Channel near the intersection of E 22nd Avenue and Tower Road and Acme Concrete Channel directly to its South, both of which feed into Sand Creek at their Easternmost boundary. A Concrete Stormwater Channels Assessment (the Study) was completed in 2021 by Brown & Caldwell on behalf of Aurora Water, with report issued April 2022. The Study evaluated the condition of 14 concrete channels throughout Aurora and provided recommended improvements. As a result of this study and its findings, the identified channel repairs were allocated into several packages within the Stormwater Capital Budget. This project is the first package scope developed from the Study: the rehabilitation of the Wagner Concrete Channel near the intersection of E 22nd Avenue and Tower Road and Acme Concrete Channel directly to its South, both of which feed into Sand Creek at their Easternmost boundary. Question Deadline 10/24/2025 at 5:00 PM MT Questions are submitted online No, Any questions must be submitted in writing by email to Alyssa Sweet, Project Manager, at asweet@auroragov.org, and to Brian Hancock at bhancock@auroragov.org. Emailed questions shall contain the project name and number in the email subject line, and must be received no later time Questions will be answered via addendum posted to online. Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond in an amount of not less than five percent (5%) of the amount of the Bid. In addition, the bid guarantee shall be accompanied in the same file as the bid. Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $1,700.00 per day. The Contract Documents require that all work be Substantially Complete by January 20, 2026 with Final Completion by February 20, 2026. The estimated cost for this project is from $1,550,000.00 to $1,800,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This item includes obtaining of all permits and conformance to all permit requirements, bonds, insurance, public and media relations, administrative items, moving onto the site, furnishing and erecting temporary construction facilities, project signs, and all other work and operations that must be performed or costs incurred before beginning Work on the project Site, as well as demobilization and project closeout, all as required for the complete and proper performance and completion of the Work.
Post-Bid
Water / Sewer
$1,800,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
