Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 13, 2025 at 8:00 PM
Updated October 14, 2025
Renovation of a municipal facility in Pierre, South Dakota. Design plans call for the renovation of a municipal facility.
Design and construction administration for the bathrooms located at the Visitor Center, Sutherland, and MacKay Buildings to be ADA compliant as well as update all fixtures and finishes. The scope of work will ensure that at least one unisex restroom will be in each building to comply with State law. Architect/engineer's obligations under the agreement documents shall commence upon the execution hereof by all signatories and, if all other terms and conditions are satisfied, shall end on december 30, 2028 unless otherwise terminated or extended pursuant to the terms hereof, except for the architect/engineer's obligations under parts ix, xi, and xii of this agreement, which by their terms survive the completion of the project and part x.A.2, which shall be continued for a minimum of 3 years after the date of the certification of the final architect/engineer's payment request. Architect/Engineer has obtained all licenses, certifications, permits, and authorizations necessary to perform the services under this Agreement and currently is in good standing with all regulatory agencies that regulate any or all aspects of Architect/Engineer's performance of the services. Architect/Engineer will maintain all required certifications, licenses, permits, and authorizations during the term of this Agreement at its own expense. If in the Construction Phase the Contractor's completion date is exceeded, and if liquidated damages are assessed Architect/Engineer will be compensated for its extra services beyond the completion date by sharing a negotiated portion of said liquidated damages. State reserves the right to reject any person from performing services under this agreement who state believes would be detrimental to the services, presents insufficient skills, presents inappropriate behavior or is considered by state to be a security risk. The method of Contractor Selection has not been Determined at this time.
Design
Municipal
$1,500,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2027
500 E Capitol Ave, Pierre, SD
Related To This Project
Pierre, SD
Bid Date: Oct 31 2025
Pierre, SD
Bid Date: Nov 05 2025
Pierre, SD
Bid Date: Dec 01 2025
Pierre, SD
Bid Date: Dec 15 2025
Pierre, SD
Bid Date: Dec 03 2025
Pierre, SD
Bid Date: Dec 23 2025
Pierre, SD
--
Pierre, SD
Bid Date: Oct 22 2025
Pierre, SD
Bid Date: Oct 14 2025
Pierre, SD
Bid Date: Sep 11 2025
Pierre, SD
Bid Date: Sep 04 2025
Pierre, SD
Bid Date: Sep 04 2025
Pierre, SD
Bid Date: Sep 12 2025
Pierre, SD
Bid Date: Aug 15 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
