BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 21, 2025

Demolition, site work, paving and asbestos abatement for a mixed-use development in Mount Carmel, Pennsylvania. Completed plans call for the demolition of a residential development; for site work for a residential development; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for asbestos abatement for a residential development.

In addition to the Equal Employment requirements of Executive Order 11246 regarding discrimination, the Contractor must also establish a 6.9% goal for female participation and a 1.0% goal for minority participation in his aggregate on-site construction workforce for Contracts in excess of $10,000. The property is located in the Borough of Mount Carmel at 429 & 431 East Third Street, but the numbers on the structure is 431 & 433 East Third Street due to 911 updates. The structure is burnt and uninhabitable. The Contractor will be responsible for obtaining and paying for any required permits. The structure is burnt and uninhabitable. The Work comprises the demolition of structure, fencing, retaining wall, private sidewalk, foundation work, rubbish, asbestos abatement as needed, utility disconnect work, installation of a new handrail, and wooden fence, property restoration and all appurtenances for a complete job in accordance with the Contract Documents. The Structure has been declared unsafe to enter to complete the asbestos testing. The Engineer's Certified AsbestosInspector will be onsite during the demolition process. The building materials must be kept adequately wet at all times, starting with the demolition process, through site cleanup, transport and final disposal. "Adequately wet" means sufficiently wet to prevent the release of particulates and there are no visible emissions observed from any asbestos-containing material. If visible emissions are observed, the demolition must cease, and additional wetting must be performed until no emissions are occurring. The Work comprises the demolition of structure, fencing, retaining wall, private sidewalk, foundation work, rubbish, asbestos abatement as needed, utility disconnect work, installation of a new handrail, and wooden fence, property restoration and all appurtenances for a complete job in accordance with the Contract Documents. The Structure has been declared unsafe to enter to complete the asbestos testing. The Engineers Certified Asbestos Inspector will be onsite during the demolition process. The building materials must be kept adequately wet at all times, starting with the demolition process, through site cleanup, transport and final disposal. Questions Due Date: Oct 22nd 2025, 4:00 PM EDT Questions Online Portal

Award

Residential Subdivision

$16,280.00

Public - City

Asbestos Abatement, Demolition, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
509
Active Projects
275
Bidding Soon
2,134
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2025

November 26, 2025

Project location map

Multiple Locations, Mount Carmel, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.