Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 14, 2025 at 7:00 PM
Updated November 15, 2025
Demolition, site work and renovation of a water / sewer project in Vernal, Utah. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.
AVWTP BWRB Rehabilitation Project The work consists of demolishing the existing masonry walls and metal roof cover surrounding the existing Backwash Recovery Building inlet structure and constructing new cast in place concrete walls and sloped roof with monolithic curb and equipment hatch with apron mount. A new light will be installed in the new concrete enclosure including required new conduit, conductors, and switch as specified. The project will also replace the existing Backwash Recovery Building inlet structure slide gates and actuators, solids pumps/recovered water pumps with associated valving, solids and recovered water main header valves, and select sections of existing piping with new grooved couplings as specified. The project will also replace existing pump gauges in kind and electrical conductors (power and control) in kind for the existing slide gates, pumps, and actuated valves. In addition, work includes removing the existing buried diesel fuel lines between the existing two fuel storage tanks and two emergency generators, constructing new cast in place concrete diesel fuel line trenches with removable covers, installing new diesel fuel lines from the fuel tanks to the generators and connecting the new fuel lines to the existing fuel lines as required. Removal of existing buried diesel fuel lines shall be performed by or supervised by a Utah certified underground storage tank (UST) remover. Pre-qualification requirements: Contractor preapproval is required by Owner and only preapproved Bidders will be allowed to submit a sealed Bid. Removal of existing buried diesel fuel lines shall be performed by or supervised by a Utah certified underground storage tank (UST) remover. Question Deadline 10/15/2025
Post-Bid
Water / Sewer
$600,000.00
Public - State/Provincial
Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 23, 2025
November 24, 2025
3550 N 2500 W, Vernal, UT
Related To This Project
Vernal, UT
Bid Date: Apr 15 2021
Vernal, UT
Bid Date: Nov 04 2025
Vernal, UT
Bid Date: Dec 05 2025
Vernal, UT
Bid Date: Dec 22 2025
Vernal, UT
Bid Date: Oct 15 2025
Vernal, UT
Bid Date: Oct 23 2025
Vernal, UT
Bid Date: Oct 30 2025
Vernal, UT
Bid Date: Sep 09 2025
Vernal, UT
Bid Date: Sep 18 2025
Vernal, UT
Bid Date: Aug 29 2025
Vernal, UT
Bid Date: Aug 08 2025
Vernal, UT
Bid Date: Aug 21 2025
Vernal, UT
Bid Date: Aug 11 2025
Vernal, UT
Bid Date: Aug 01 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
