BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Demolition, site work and renovation of a water / sewer project in Vernal, Utah. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

AVWTP BWRB Rehabilitation Project The work consists of demolishing the existing masonry walls and metal roof cover surrounding the existing Backwash Recovery Building inlet structure and constructing new cast in place concrete walls and sloped roof with monolithic curb and equipment hatch with apron mount. A new light will be installed in the new concrete enclosure including required new conduit, conductors, and switch as specified. The project will also replace the existing Backwash Recovery Building inlet structure slide gates and actuators, solids pumps/recovered water pumps with associated valving, solids and recovered water main header valves, and select sections of existing piping with new grooved couplings as specified. The project will also replace existing pump gauges in kind and electrical conductors (power and control) in kind for the existing slide gates, pumps, and actuated valves. In addition, work includes removing the existing buried diesel fuel lines between the existing two fuel storage tanks and two emergency generators, constructing new cast in place concrete diesel fuel line trenches with removable covers, installing new diesel fuel lines from the fuel tanks to the generators and connecting the new fuel lines to the existing fuel lines as required. Removal of existing buried diesel fuel lines shall be performed by or supervised by a Utah certified underground storage tank (UST) remover. Pre-qualification requirements: Contractor preapproval is required by Owner and only preapproved Bidders will be allowed to submit a sealed Bid. Removal of existing buried diesel fuel lines shall be performed by or supervised by a Utah certified underground storage tank (UST) remover. Question Deadline 10/15/2025

Post-Bid

Water / Sewer

$600,000.00

Public - State/Provincial

Demolition, Renovation, Site Work

15

26

5

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
6
Bidding Soon
67
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

November 24, 2025

Project location map

3550 N 2500 W, Vernal, UT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.