BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Site work for a civil project in Neillsville, Wisconsin. Completed plans call for site work for a bridge / tunnel; and road / highway.

**As of December 4, 2025, the project was awarded to Paul Bugar Trucking but the awarded amount is not available.** Culvert Replacement Project The Town of York is Seeking Bids From Qualified Vendors for the Replacement of Three Culverts on Owen Ave, South of Heintown Rd. The Project Will Include Widening the Road at the Site, and the Vendor Will Need to Bring in Gravel of Wisconsin Department of Transportation Specification Gradation " Crushed Aggregate Base. The Town of York Reserves the Right to Accept or Reject Any and All Bids, or Parts Thereof, and Waive Any Technicalities. The Town of York is requesting sealed bids for the replacement of three culverts located on Owen Ave. Work includes removal of the three existing culverts, installation of two new arch aluminized corrugated steel pipe culverts #84 - 95" x 67" x 49' and a third aluminized corrugated steel pipe culvert 48” x 46’ (supplied by the township), roadway restoration, erosion control, and site stabilization. Sealed bids will be accepted at W4196 Pine Creek Rd, Neillsville, WI 54456 by Friday, October 31st, 2025 at 5:00 PM. Sealed bids are scheduled to be opened on Monday, November 3rd at 7:00 PM at the York Town Hall (address above). Town has the right to accept any bid, accept a combination of bids, reject any bid, reject all bids, waive any technicality in a bid, and right to ask contractor for clarification in a bid prior to award. Mobilization, traffic control, and temporary signage. De-watering, removal and disposal of existing culvert. Installation of new two new 84” arch aluminized corrugated steel pipe culverts. Culverts are purchased and provided by the Town of York. Bidder is responsible for transporting culverts from Town of York garage to project site. Placement of bedding and backfill per specifications. Compaction in 8” lifts from bottom of culvert to road surface. Plate compactor or jumping jack required until one foot above culvert, then self-propelled drum roller could be used. Roadway reconstruction. Erosion and sediment control measures. Site grading, seeding, and stabilization.

Occupancy

Bridges / Tunnels

$145,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
48
Bidding Soon
448
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2025

November 24, 2025

Project location map

Owen Ave, Neillsville, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.