Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 20, 2025 at 7:00 PM
Updated November 21, 2025
Site work for a water / sewer project in Minot, North Dakota. Completed plans call for site work for a water / sewer project.
In general, the Work included in the Project includes the labor, materials, tools, and equipment required to construct MREFPP Phase MI 7G Roosevelt Zoo Exhibit as fully depicted in the Drawings and Technical Specifications for the Project. The project is located within Ward County, North Dakota. All Bids are to be submitted on the basis of cash payment for the Work. Each paper bid must be in a sealed envelope accompanied by a separate envelope containing the contractor's license and bid security. No electronic bid will be considered if it does not fully comply with the document submission requirements of the vBid system, including acknowledgement of all addenda, copy of Contractors License, and a submission of the bid security. The bid security must be in a sum equal to five percent (5%) of the full amount of the Bid and must be in the form of a bidder s bond. A bidder s bond must be executed by the bidder as principal and by a surety, conditioned that if the principal s bid is accepted and the contract awarded to the principal, the principal within ten days after notice of the award, shall execute a contract in accordance with the terms of the Bid and the bid bond and any condition of the governing body. A countersignature of a bid bond is not required. If a successful bidder does not execute a contract within the ten days allowed, the bidder s bond must be forfeited to the governing body and the project awarded to the next lowest responsible bidder. The bidder must be licensed for the full amount of the bid as required by Section 43-07-12 of the North Dakota Century Code. Est. Completion Date: Aug. 27, 2027 Est. Value: $ 4,450,000.00 The Owner reserves the right to hold all bids for 75 days, to reject any or all Bids and to waive any informality or irregularity in any Bid and to accept the Bid deemed in the best interest of the Owner. The Owner reserves the right to rebid the project until a satisfactory Bid is received. The Work shall be substantially complete by August 27, 2027. Work shall be complete and ready for final payment in accordance with the General Conditions by September 24, 2027. Should the Contractor fail to complete its obligations under the Contract within the time required herein or within such extra time as may have been granted by formal extensions of time approved by the Owner, there will be deducted from any amount due to the Contractor the sum of $2,000.00 per day (with no suspension for winter work) for each and every calendar day that the substantial or final completion of the Work is delayed. The Contractor and his Surety will be liable for any excess. Such payment will be as and for liquidated damages and not as a penalty. ** doc info : Copies of the documents are available for viewing at the following locations during normal business hours, Monday through Friday, excluding holidays: Ackerman-Estvold Engineering: 1907 17th Street SE, Minot, ND ** bid date info :For paper bid submittals, the outside of the sealed envelope containing the bid and other required items shall be endorsed with the following verbiage: 1. "Souris River Joint Water Resource Board, Mouse River Enhanced Flood Protection Project, Phase MI 7G Roosevelt Zoo Exhibit". No Bid may be read or considered if it does not fully comply with the requirements of Section 48-01.2-05 of the North Dakota Century Code. Any deficient Bid received will be resealed and returned to the Bidder immediately. Question Deadline 10/28/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing.Questions received less than seven days prior to the date for opening of Bids may not be answered. Bid-Results :- 1. Single Prime Construction- Rolac Contracting, Inc.-$ 3,693,000 2. Separate Prime General Construction- ICS, Inc- $3,802,265 3. Separate Prime Mechanical Construction- Mowbray & Son Plumbing & Heating-$ 339,417
Bid Results
Water / Sewer
$7,834,682.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 4, 2025
April 6, 2026
1215 11th Ave SW, Minot, ND
Related To This Project
Minot, ND
Bid Date: Oct 21 2025
Minot, ND
Bid Date: Nov 24 2025
Minot, ND
--
Minot, ND
Bid Date: Dec 02 2025
Minot, ND
Bid Date: Dec 09 2025
Minot, ND
Bid Date: Nov 18 2025
Minot, ND
Bid Date: Dec 18 2025
Minot, ND
Bid Date: Jan 13 2026
Minot, ND
Bid Date: Nov 04 2025
Minot, ND
Bid Date: Oct 03 2025
Minot, ND
Bid Date: Oct 07 2025
Minot, ND
Bid Date: Sep 26 2025
Minot, ND
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.