Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 14, 2025 at 7:00 PM
Updated November 15, 2025
Site work for a road / highway in Westville, Florida. Completed plans call for site work for a road / highway.
Counties : Holmes, Walton, Washington Road Name: Ponce De Leon Maint - Multipost Sign Maintenance Limits: Midpoint Project(s): 42214337228(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: Thru 12/31/26 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: Description: The Improvements under this Work Document-Driven Contract consist of providing labor, materials, and equipment necessary to remove, install, clean, repair and/or replace multi-post signs on both Interstate and Primary roadways in Holmes, Walton, and a portion of Washington Counties. These signs shall be brought up to current Standards to meet the requirements of the Maintenance Rating Program (MRP) and to ensure the safety of the traveling public. Mobilization and Maintenance of Traffic will be incidental to the work performed. This contract has a budgetary estimate of $30,000.00. The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Department estimated quantities and the Contractors bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder, however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work. A Proposal Guaranty will not be required on indefinite quantity contracts, such as work document driven contracts, with the departments advertised estimate amount of $150,000 or less regardless of the bid amount. The Performance Bond Has Been Waived for This Project. Question Deadline 11/06/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online A 100% Payment Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 007 - Sign Maintenance - Holmes, Walton, Washington
Bid Results
Roads / Highways
$249,935.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 13, 2025
December 15, 2025
Multiple Locations, Westville, FL
Related To This Project
Westville, FL
Bid Date: Jan 30 2026
Westville, FL
Bid Date: Dec 11 2025
Westville, FL
Bid Date: Oct 09 2025
Westville, FL
Bid Date: Oct 09 2025
Westville, FL
Bid Date: Sep 04 2025
Westville, FL
Bid Date: Aug 26 2025
Westville, FL
Bid Date: Mar 13 2025
Westville, FL
Bid Date: Apr 10 2025
Westville, FL
Bid Date: Oct 20 2025
Westville, FL
Bid Date: Dec 12 2024
Westville, FL
Bid Date: Oct 24 2024
Westville, FL
Bid Date: Oct 24 2024
Westville, FL
Bid Date: Jun 13 2024
Westville, FL
Bid Date: Jun 13 2024
Westville, FL
Bid Date: May 09 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
