Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 31, 2025 at 8:00 PM
Updated November 1, 2025
Site work for a water / sewer project in Manchester, Tennessee. Completed plans call for site work for a one-story above grade water / sewer project.
Contract 125 consists of furnishing and installing approximately 20,800 linear feet of 6-inch, 4-inch, and 2-inch PVC water line, valves, fittings, air release valves, pavement replacement, and related appurtenances as shown on the plans. This project is supported by American Rescue Plan Act, Coronavirus State and Local Recovery Fund grant funding, and Appalachian Regional Commission funding, which imposes certain restrictions and federal requirements. Construction time allotted is 300 calendar days. Each contractor choosing to bid must obtain bid documents from James C. Hailey & Company, Consulting Engineers, with a non-refundable payment. The Hillsville Utility District notifies all bidders of non-discrimination regarding race, color, sex, or national origin. The employer is an Equal Opportunity Employer. Contracts using federal funds must include the equal opportunity clause as specified in regulations. All small, minority-owned firms and women's business enterprises are encouraged to participate. The official plan holders list is maintained by James C. Hailey & Company. Plan holders must periodically check for addenda at the provided website. Bidders must comply with the Prevailing Wage Rate provisions per Tennessee State law and the Federal Davis-Bacon Act, whichever is higher. Qualified Disadvantaged Business Enterprises (DBE) are encouraged to bid and review documents. The Copeland Anti-Kickback Act applies. Contractors and subcontractors must not appear on the Sam.gov disbarment list. A detailed list of all subcontractors with qualifications is required. Mark-ups on subcontractor work or Cost Plus Overhead are disallowed for reimbursement. Each bid must be accompanied by a bid bond or certified check for 5% of the total bid amount. The successful bidder will provide a performance bond equal to the amount of the bid and must be licensed as a contractor for the district before starting work. No bid may be withdrawn within 90 days after the scheduled receipt date. The owner reserves the right to waive informalities or reject any or all bids. QA date - 10-24-2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Contact James C. Hailey & Company at 615-883-4933 for submittal of questions Questions received less than five (5) days prior to the date for opening of Bids may not be answered.
Bid Results
Water / Sewer
$2,019,700.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2025
December 29, 2025
Multiple Locations, Manchester, TN
Related To This Project
Manchester, TN
Bid Date: Nov 20 2025
Manchester, TN
Bid Date: Nov 21 2025
Manchester, TN
Bid Date: Dec 02 2025
Manchester, TN
Bid Date: Dec 04 2025
Manchester, TN
Bid Date: Dec 04 2025
Manchester, TN
Bid Date: Jan 08 2026
Manchester, TN
--
Manchester, TN
Bid Date: Feb 06 2026
Manchester, TN
Bid Date: Oct 30 2025
Manchester, TN
Bid Date: Nov 07 2025
Manchester, TN
Bid Date: Nov 07 2025
Manchester, TN
--
Manchester, TN
Bid Date: Oct 06 2025
Manchester, TN
Bid Date: Oct 02 2025
Manchester, TN
Bid Date: Oct 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
