Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 10, 2025 at 7:00 PM

Updated November 11, 2025

Site work for a playground / park / athletic field in Madison, Alabama. Completed plans call for site work for a playground / park / athletic field.

This project consists of the removal of the existing baseball backstops for eight fields at Palmer Park and supplying and installing new chain-link backstop fencing designed for safety and durability according to local codes and standard field requirements. All work is to be performed per the general and technical specifications provided in the Invitation to Bid packet. Expected completion date is February 1, 2026. PART 1 - GENERAL 1.1 MATERIAL AND INSTALLATION REQUIREMENTS A. Contractor Responsibility: The contractor shall be responsible for removal of the existing backstops and for providing the equipment, labor, material, and installation of the new backstops as summarized below. The backstops must be installed as per the manufacturer's recommendations, guidelines, and instructions. Contractor shall coordinate with the Owner's Representative to meet the installation requirements. B. Fields 1. Upper Quad - Fields 3, 4, 5, & 6 2. Lower Quad - Fields 9, 10, 11, & 12 3. Contractor shall prioritize the completion of the Lower Quad backstops and begin construction on Fields 9 - 12 first. The Lower Quad backstops must be 90% complete before Contractor begins construction on the Upper Quad backstops. C. Demolition and Site Prep 1. Removal of 1,052' x 30' tall existing fencing/debris backstops. Site preparation and layout marking. D. Materials 1. 9-gauge bonded vinyl, 2" mesh 2. 3" OD DQ-40 40 galvanized steel posts (main uprights) 3. 1 5/8" DQ-40 top and bottom rails 4. Tension bars, bands, ties, clamps, and all necessary hardware 5. 9-gauge extruded bonded vinyl chain link E. Structure Dimensions 1. Total Length: 880' Height: 120" 2. Total Length: 928' Height: 96" F. Installation - General 1. Concrete footings for all posts 2. Fence framework assembly and fabric installation 3. Tensioning and bracing for wind load resistance G. Installation - Specific 1. Remove 8 dugout roof tops and reinstall with new green roof tops and posts 2. Remove and dispose of netting fabric and framework, 800' total 3. Remove and dispose of fence fabric and framework at 8 dugouts 4. Remove concrete curbing at 8 ball fields and reinstall 1,360' of new concrete curbing 5. Remove 10' of concrete slabs - install 10' of concrete slab at 2 dugouts 6. Take down and reinstall all electrical outlets and junction boxes at 8 ball fields 7. Install 928' of 8' black vinyl bonded 9-gauge chain-link fabric 8. Install 880' of 10' black vinyl bonded 9-gauge chain-link fabric 9. Install 60' of new netting with a 2" overlap onto the 10' fence 10. Fabric mounting system for dugout roofs 11. Installing 48 - 8 5/8" x 42' Black DQ-40 Back Stop Post 12. Set Post 10' x 24" in ground with 4500psi concrete/truck pour 13. Install 8 back stop nettings 22' x 150', #42HDPE TWISTED KNOTTED NETTING 3.75" Stretch Mesh Only properly licensed general contractors per Alabama law may submit a bid. No pre-qualification is required for this project.

Bid Results

Playgrounds / Parks / Athletic Fields

$676,178.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
47
Bidding Soon
823
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2025

December 8, 2025

Project location map

574 Palmer Rd, Madison, AL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed