Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Site work for a water / sewer project in Cottleville, Missouri. Completed plans call for site work for a water / sewer project.

Removal and disposal of trees, brush, excess sediment and concrete swales including grading and revegetation of all disturbed areas within the North Central Drive detention basin. Bids must be submitted on the appropriate bid forms provided and must be accompanied by a Bid Security in the amount equal to and not less than five percent (5%) of the base bid, payable without recourse to the City. The Security may be in the form of a certified cashier's check or a bidder's bond in the same amount from an Incorporated Surety licensed to do business in the State of Missouri as a guarantee that the bidder will enter into a contract and execute a one hundred percent (100%) performance bond, a one hundred percent (100%) payment bond, and guaranty forms provided within ten (10) days after notice of acceptance of bid to him. Bid checks will be returned to the unsuccessful bidders if their bid is rejected. No bidder may withdraw his bid within 90 days after the bid opening. The City of O'Fallon, Missouri retains the right to reject any or all bids submitted. Question Deadline 10/22/2025 at 2:00 PM CT There is a mandatory bidder's questionnaire (enclosed with the spec book) that is due with the bid. If the questionnaire is not received by this date and time, the general contractor will not be able to submit a bid on this project. The enclosed Request for Information (RFI) form shall be used for all submittals. Questions may be directed to the Project Manager; Ruth Field as follows: via email at rfield@ofallonmo.gov Prevailing Wage requirements will apply if the project cost exceeds $75,000.00. The wage rates applicable to this project have been determined as required by law and are set forth in the specifications. All methods, procedures, equipment, and workmanship used for the completion of this project must be in accordance with the attached Contract Documents. All requests for clarification on these bidding documents must be received no later than Wednesday, October 22, 2025 by 2:00 PM. The enclosed Request for Information (RFI) form shall be used for all submittals. Questions may be directed to the Project Manager; Ruth Field as follows: via email at rfield@ofallonmo.gov The CITY reserves the right to reject any and all Bids for any reason, to waive informalities therein to determine the lowest and best bid, and to approve the bond. No Bid may be withdrawn for a period of ninety (90) days subsequent to the specified time for receipt of Bids.

Bid Results

Water / Sewer

$46,077.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
100
Bidding Soon
1,258
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2025

December 20, 2025

Project location map

N Central Dr, Cottleville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.