BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2025 at 7:00 PM

Updated December 2, 2025

Site work and new construction of a fire / police facility in Plainfield, Connecticut. Completed plans call for the construction of a 17,716-square-foot fire / police facility; and for site work for a fire / police facility.

**As of December 01, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The Project consists of new construction and related sitework for a new Fire Headquarters for Plainfield Volunteer Fire Company #1 to be located at 12 Railroad Avenue, Plainfield, CT. 1. Work covered in this section shall include the testing of areas and spaces at the project site for airborne fibers. All testing in this section shall be conducted by a qualified Air Monitoring Technician by Environmental Consultant. 2. The following testing will be included within the scope of work of the Air Monitoring Technician. 3. Final Clearance Monitoring - air sampling to verify that a previously contaminated area is within the acceptable limit of fibrous contamination and in compliance with all Federal, State and Local regulations. 4. Safety Monitoring - air monitoring to determine is a previously uncontaminated area has become contaminated with fibrous material. 5. Work Area Monitoring - air monitoring in an area where asbestos-containing materials are being removed, or in an area which is being cleaned after asbestos removal but before final clearance monitoring. 6. Exposure Monitoring - Excursion and Personnel air monitoring of a worker to determine accurately the airborne concentrations of asbestos to which the work may be exposed as indicated in OSHA regulation 29 CFR 1926.1101 are the responsibility of the abatement contractor. All questions pertaining to this bid shall be emailed directly to the Architect at bhumes@jharchitects.net. he Architect and posted to the Advanced Reprographics planroom. The deadline for questions shall be Tuesday, November 11, 2025 at 12:00pm. New Fire Headquarters for Plainfield Fire Company Anticipated completion: 16-18 months.

Post-Bid

Fire / Police

$18,700,000.00

Public - City

New Construction, Site Work

106

28

82

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
874
Active Projects
470
Bidding Soon
4,418
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2025

January 19, 2026

Project location map

12 Railroad Ave, Plainfield, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.