BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 13, 2025

Site work and paving for a mixed-use development in San Francisco, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Work is at various locations in Districts 1, 2, 5 & 8 of San Francisco, California and consists of pavement renovation, curb ramp construction, sewer main replacement, traffic control, environmental and all related work. Contract duration: 300 consecutive calendar days from NTP to Substantial Completion. Class "A" license required to bid. LBE Subcontracting Participation Requirement is 25% LBE. A. Paving Work includes, but is not limited to: 1. Traffic routing work; 2. Excavating, removing and disposing of existing pavement, concrete base, parking strip, curb and sidewalk; 3. Supporting and working around existing utilities; 4. Handling all drainage or ground water; 5. Removing surplus material; 6. Cleaning project site; 7. Furnishing and placing of backfill material; 8. Constructing 2-inch thick asphalt concrete wearing surface over 8-inch thick concrete base, 10-inch thick concrete pavement, 8-inch thick concrete parking strip, 10-inch thick concrete bus pad, 6-inch wide concrete curb, 3- 1/2 -inch thick concrete sidewalk, concrete curb ramps, doweled concrete median or island, and doweled 6-inch wide concrete curb; 9. Resetting existing granite curb; 10. Adjusting City-owned manhole frame and cover to grade; 11. Adjusting City-owned catch basin frame and grating to grade; 12. Adjusting City-owned castings to grade; 13. Performing all related and incidental work, all where and as shown on the Drawings and in accordance with the Project Manual. B. Sewer Work includes, but is not limited to: 1. Mobilization and demobilization work; 2. Performing traffic routing and trench support work related to sewer and drainage work; 3. Constructing 12-inch, 15-inch, and 18-inch diameter bell and spigot type extra strength vitrified clay pipe (VCP) on crushed rock bedding wrapped in geotextile fabric; 4. Clean and televise inspection of existing main sewers prior to lining with cured-inplace liner; 5. Lining existing 8-inch, 12-inch, and 16-inch inside diameter sewer pipe with cured-in-place liner; 6. Spot line existing 8-inch and 12-inch inside diameter sewer pipe 7. Cleaning and mortaring manholes; 8. Constructing cast-in-place or precast concrete manholes and catch basins; 9. Constructing 6-inch or 8-inch diameter side sewer connections; 10. Televising existing active side sewers and culverts; 11. Repair, replacement or construction of 6-inch or 8-inch diameter side sewer and 10-inch diameter VCP culverts; 12. Abandoning, removing, and disposing existing sewers and related structures, where indicated on contract plans; 13. Post-construction TV inspection of newly lined or constructed main sewers, side sewers, and culverts; 14. Furnishing and installing connections to and between sewers, structures, and culverts; 15. Saw cutting, removing, and disposal of existing pavement; 16. Excavation, backfilling and compaction of trench; 17. Restoring concrete base inside and outside of sewer trench limit as necessary per San Francisco Street Excavation Regulations; 18. Bypassing sewer flow from main sewers, side sewers, and culverts during construction; 19. Furnishing and installing detection warning tape as detailed on SW-Drawing for trench restoration. 20. Providing exploratory holes and potholes; 21. Handling, transportation and disposal of hazardous excavated materials and contaminated soils, if encountered and if disposal is necessary; 22. At conclusion of work, cleaning existing catch basins located within contract limits; 23. Performing necessary work due to unforeseen conditions; 24. Performing all related and Incidental Work; 25. Supporting, working around and protecting certain San Francisco Water Department, Fire Department and other utility agency and company facilities in conjunction with the work under this contract; and all appurtenant work required in accordance with the Contract Documents and in accordance with San Francisco DPW Standard Specifications, dated November 2000 Question Deadline 10/31/2025 Au.Bui@sfdpw.org The City may not answer questions received less than 10 calendar days prior to the date for opening Bids

Post-Bid

Roads / Highways

$4,700,000.00

Public - City

Paving, Site Work

55

16

6

3

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
13
Bidding Soon
1,938
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

January 12, 2026

Project location map

Multiple Locations, San Francisco, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.