BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Site work for a water / sewer project in South San Francisco, California. Completed plans call for site work for a water / sewer project.

The Project consists of: a. Providing a storm drain line system between two existing drains. b. Details on excavation, pipe layout, infill compaction and asphalt cover are provided in the Bid drawing documents. A bid bond by an admitted surety insurer on the form provided by the District a cashier's check or a certified check, drawn to the order of the South San Francisco Unified School District, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the Contract for the Work. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. Question Deadline 10/24/2025 at 5:00 PM PT All questions about the meaning or intent of the Contract Documents are to be directed via email to the District to _wchowdhury@ssfusd.org A. Provide new storm water drainage system per the requirements noted in the Contract drawings and Specifications document B. Excavation and backfill will be a major part of the project. Review the Specifications on the requirements. C. Provide a 5'-0" high chain link fence to separate the area of trenching including the asphalt yard to separate school functions from construction events. Following the start of winter break, the barrier can extend to the point of connection near the locker room . *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Award

Water / Sewer

$138,700.00

Public - City

Site Work

6

9

10

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
534
Active Projects
259
Bidding Soon
2,794
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2025

December 1, 2025

Project location map

116 Romney Ave, South San Francisco, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.