BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 19, 2025 at 8:00 PM

Updated November 7, 2025

Site work for a sidewalk / parking lot in Bloomington, Indiana. Completed plans call for site work for a one-story above grade sidewalk / parking lot.

Sealed proposals are requested for Hardscape Improvements 2025, Project at Showers Building located at 501 N. Morton St., Bloomington, Indiana. Proposals will be received until 10:00 a.m. local standard time on November 6, 2025, at the Legal office, 100 W. Kirkwood Ave Courthouse, Second Floor, Room 220, Bloomington, IN 47404, at which time they will be opened and publicly read aloud. Attendance at the scheduled pre-bid meeting is highly recommended, which will be held at 10:00 a.m., local time, on October 24, 2025, at the project site. Proposals received after the designated time will be returned unopened. Proposals must be submitted in duplicate using the provided Bid Supplement, properly filled in, together with Indiana State Board of Account Form No. 96 (2013), Parts I and II. Each proposal must be accompanied by a certified check, cashier's check, money order, or satisfactory Bid Bond for not less than 5-percent of the total Bid price, made payable to the Owner, and delivered in a sealed opaque envelope listing the Bidder's name and address. Prime contractors are encouraged to involve qualified minority subcontractors and must provide evidence that such quotations have been solicited. Work must comply with specifications and contract drawings prepared by the Architect/Consultant. The project is let as a single, prime contract. Base and Alternate Bids should be submitted as described. Owner reserves the right to accept or reject any bid or waive any informality or errors during a period of 30 days from the bid date. Contracts are intended to be awarded within 30 days. Should a Bidder withdraw their Bid within this period without consent or fail to execute a satisfactory contract including bonds within 10 days of written notice of acceptance, the Bid Security may be forfeited as liquidated damages. The successful Bidder must provide a Performance Bond and a Labor and Material Payment Bond equal to 100 percent of the contract amount, both to remain effective for 12 months after acceptance of work and to be furnished at the Notice to Proceed.

Post-Bid

Sidewalks / Parking Lot

$1,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
109
Bidding Soon
1,400
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2025

December 8, 2025

Project location map

501 N Morton St, Bloomington, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.