Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 10, 2025 at 7:00 PM
Updated November 25, 2025
This is a service / maintenance or supply contract in Pleasanton, California. Contact the soliciting agency for additional information.
It is the intent of these specifications, terms, and conditions to describe Landscape Maintenance Services for Stanley Boulevard being requested by the Alameda County Public Works Agency (PWA). The County intends to award a three-year contract (with the option to renew for two years) to the Bidder selected as the lowest responsive and responsible Bidder whose response meets the County's requirements. These specifications, terms, and conditions are to procure the most environmentally preferable products with equivalent or higher performance and at an equal or lower cost than traditional products. Background The landscaping services required are along a three-mile section of Stanley Boulevard between the cities of Pleasanton and Livermore on the north and south sides of the roadway, plus the center median. This project area was designed as a Bay-Friendly Rated Landscape. Bay-Friendly Landscaping is a comprehensive approach to the design, construction and maintenance of landscapes that contributes to the health of the San Francisco Bay Watershed. The project includes landscape planting with native plant materials, reclaimed water irrigation system, curb inlets and bio-swales to capture and filter storm water. Project elements also include landscaped medians, bicycle paths, pedestrian amenities, and guardrails. The services required include maintenance of plants, trees, groundcovers, shrubs, irrigation systems, various paved surfaces, trash/recycling receptacles, storm water elements, site furnishings and special elements, etc. Some of the activities included are weed removal, trash/debris removal, recycling/composting of various wastes, cleaning and adjusting irrigation system, repair and inspection, tree trimming, shrub, and groundcover trimming, etc. Alameda County Vendor Outreach:October 22, 2025 Online TEAMS meeting Questions Due:October 28, 2025, 5:00pm
Post-Bid
Playgrounds / Parks / Athletic Fields
Public - County
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 24, 2025
July 1, 2026
Stanley Blvd, Pleasanton, CA
Related To This Project
Pleasanton, CA
Bid Date: Dec 29 2025
Pleasanton, CA
Bid Date: Nov 10 2025
Pleasanton, CA
Bid Date: Nov 18 2025
Pleasanton, CA
Bid Date: Feb 03 2026
Pleasanton, CA
Bid Date: Dec 10 2025
Pleasanton, CA
Bid Date: Jan 14 2026
Pleasanton, CA
--
Pleasanton, CA
--
Pleasanton, CA
Bid Date: Oct 28 2025
Pleasanton, CA
--
Pleasanton, CA
Bid Date: Oct 30 2025
Pleasanton, CA
Bid Date: Oct 23 2025
Pleasanton, CA
Bid Date: Nov 25 2025
Pleasanton, CA
--
Pleasanton, CA
Bid Date: Sep 23 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
