Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 20, 2025 at 8:00 PM
Updated October 21, 2025
Renovation of a road / highway in Augusta, Georgia. Conceptual plans call for the renovation of a road / highway.
The applicant is proposing to replace a transmission line over the Savannah River in Effingham County, Georgia and Jasper County, South Carolina. The proposed action would occur over the Savannah River Below Augusta (SRBA) Federal Navigation Channel. The line would be replaced at the same height as the existing line (89 feet above the ordinary high water mark), and use the existing transmission structures. Section 408 Coordinator: Mr. Steven Lewis, at steven.p.lewis@usace.army.mil or (912) 710-8659 APPLICANT: WSP 1308 Patton Avenue Asheville, North Carolina 28806 Overview: WSP is proposing to replace transmission lines over the Savannah River in Effingham County, Georgia and Jasper County, South Carolina. The proposed action will occur over the Savannah River Below Augusta (SRBA) Federal Navigation Channel, which has an authorized depth of 9 feet, and an authorized width of 90 feet. As the proposed action will consist of work over the SRBA Federal Navigation Channel, which is a USACE Civil Works project, a Section 408 review is required to determine the impacts of the proposed action to the navigation channel. The public is invited toprovide comments on this review at the addresses listed at the end of this notice no later than November 1, 2025. Requester’s Proposed Action: WSP is proposing to replace an existing 230kV overhead transmission line with new line (reconductor). Reconductoring involves installing the new conductor using standard stringing methods while removing the old conductor. The overhead transmission line will have the line replaced at the same height as the existing line, on the existing transmission structures. During replacement, the conductor will not be temporarily lowered, and existing clearance over the channel throughout construction will be maintained. The nearest downstream bridge of the proposed action is the I-95 bridge, which has a vertical clearance of 55 feet. The current transmission line height is 89 feet above the ordinary high water mark (OHWM) and will remain at 89 feet above the OHWM.
Conceptual
Roads / Highways
$1,886,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 31, 2025
To Be Determined, Augusta, GA
Related To This Project
Augusta, GA
Bid Date: Nov 19 2025
Augusta, GA
--
Augusta, GA
Bid Date: Dec 03 2025
Augusta, GA
Bid Date: Nov 12 2025
Augusta, GA
Bid Date: Jan 07 2026
Augusta, GA
Bid Date: Nov 06 2025
Augusta, GA
Bid Date: Nov 07 2025
Augusta, GA
Bid Date: Nov 26 2025
Augusta, GA
Bid Date: Dec 02 2025
Augusta, GA
Bid Date: Oct 20 2025
Augusta, GA
Bid Date: Oct 20 2025
Augusta, GA
Bid Date: Nov 19 2025
Augusta, GA
Bid Date: Nov 05 2025
Augusta, GA
--
Augusta, GA
Bid Date: Oct 20 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
