BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

Site work for a warehouse / distribution facility in Barre, Massachusetts. Completed plans call for site work for a one-story above grade warehouse / distribution facility.

The work includes removal of a partially collapsed existing stone retaining wall at the Ware River Shaft 8 Lower Garage in Barre, MA. The partially collapsed stone retaining wall, located behind the garage, will be replaced with a precast modular block gravity wall (precast retaining wall) in the same location with a comparable footprint and elevations. Interested firms must register and join the Planholders List through the MWRA Supplier Portal to access contract documents and submit bids electronically. No paper bids will be accepted.

Bid Results

Warehouse / Distribution

$601,000.00

Public - State/Provincial

Site Work

11

18

15

9

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
821
Active Projects
424
Bidding Soon
4,168
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2025

January 2, 2026

Project location map

1311 Worcester Rd, Barre, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.