BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2025 at 7:00 PM

Updated December 23, 2025

Site work for a bridge / tunnel in Poplar Point, Manitoba. Completed plans call for site work for a bridge / tunnel.

Reference Number 0000305362 Question Acceptance Deadline 2025/11/07 12:00:00 PM CDT Questions are submitted online No All enquiries regarding the Work may be made to: Lakhdeep Brar Junior Structures Engineer 600 - 215 Garry Street, Winnipeg, MB R3C 3P3 204-915-5543 Lakhdeep.Brar@gov.mb.ca - Bid Bond 10 % Demolition and removal of the existing two span timber bridge structure and construction of a new three-cell reinforced concrete box culvert and associated works over Sturgeon Creek East Branch on PR 227, 1.3 km West of PTH 6 near Warren, Sec. NW 20-13-01-W, in the Municipality of Woodlands, Site No. 733-10 Demolition and removal of the existing single span timber bridge structure and construction of a new three-cell reinforced concrete box culvert and associated works over Sturgeon Creek West Branch on PR 227, 5.5 km West of PTH 6 near Warren, Sec. NW 23-13-02-W, in the Municipality of Woodlands, Site No. 3979-10. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Bridges / Tunnels

$3,595,696.00

Public - State/Provincial

Site Work

54

4

2

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
110
Bidding Soon
568
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

December 4, 2025

Project location map

MB-227, Poplar Point, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.